[1]
Montilla-Djesus, M ; Santos-Martin, D ; Arnaltes, S ; Castronuovo, ED. Optimal reactive power allocation in an offshore wind farms with LCC-HVdc link connection[J]. Renewable Energy, 2012, Vol. 40(1).
DOI: 10.1016/j.renene.2011.09.021
Google Scholar
[2]
Abbes, Dhaker ; Martinez, André ; Champenois, Gérard. Life cycle cost, embodied energy and loss of power supply probability for the optimal design of hybrid power systems[C]. Mathematics and Computers in Simulation, 2013. 05. 004.
DOI: 10.1016/j.matcom.2013.05.004
Google Scholar
[3]
Xiaoli Zhu; Xiuqing Huang; Xiongjian Liang. Cluster-Based Procurement Management Optimization Strategies for Telecom Companies[C]. Fuzzy Systems and Knowledge Discovery, 2009. FSKD '09. Sixth International Conference on, vol. 1, no., p.440, 444, 14-16 Aug. (2009).
DOI: 10.1109/fskd.2009.102
Google Scholar
[4]
Attivissimo, Filippo ; Giaquinto, Nicola ; Savino, Mario. Uncertainty evaluation in dithered ADC-based instruments[J]. Measurement, 2008, Vol. 41(4).
DOI: 10.1016/j.measurement.2007.02.008
Google Scholar
[5]
Borghagen, L.; Brinkhagen, L. LCC-Procurement at the Swedish State Railways. Reliability and Maintainability Symposium[C]. 1984 . Proceedings. Annual , vol., no., p.349, 358, (1984).
DOI: 10.1109/rams.1984.764316
Google Scholar
[6]
Sellick, R.L.; Åkerberg, M. Comparison of HVDC Light (VSC) and HVDC Classic (LCC) site aspects, for a 500MW 400kV HVDC transmission scheme[C]. AC and DC Power Transmission (ACDC 2012), 10th IET International Conference on, vol., no., p.1, 6, 4-5 Dec. (2012).
DOI: 10.1049/cp.2012.1945
Google Scholar
[7]
Yong Li; Longfu Luo; Rehtanz, C.; Ruberg, S.; Fusheng Liu. Realization of Reactive Power Compensation Near the LCC-HVDC Converter Bridges by Means of an Inductive Filtering Method. Power Electronics[J], IEEE Transactions on , vol. 27, no. 9, p.3908, 3923, Sept. (2012).
DOI: 10.1109/tpel.2012.2189587
Google Scholar