p.1820
p.1827
p.1832
p.1846
p.1850
p.1857
p.1863
p.1868
p.1873
Research on Interval Shield Construction Monitoring
Abstract:
According to the relationship of tunnel depth, the foundation forms of adjacent building (structures), the importance and the location of the tunnel in Nanjing Metro Line 3, the formation properties of the site is combined to carry out the analysis of key and difficult points on the worksite monitoring objects, the implementation methods of the interval shield monitoring is studied, which provides reference for similar engineering projects.
Info:
Periodical:
Pages:
1850-1853
Citation:
Online since:
January 2014
Authors:
Keywords:
Price:
Сopyright:
© 2014 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: