Research on Interval Shield Construction Monitoring

Article Preview

Abstract:

According to the relationship of tunnel depth, the foundation forms of adjacent building (structures), the importance and the location of the tunnel in Nanjing Metro Line 3, the formation properties of the site is combined to carry out the analysis of key and difficult points on the worksite monitoring objects, the implementation methods of the interval shield monitoring is studied, which provides reference for similar engineering projects.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1850-1853

Citation:

Online since:

January 2014

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Chen Dewei, Zheng Xinguang, Xiang Haifan.Construction control of concrete cable-stayed bridge [J].Journal of Civil Engineering,1993(1):106—109.

Google Scholar

[2] Luo Shaojing, Liang Chuan.Guangdong Jinma Bridge hanging basket construction [J].Bridge construction,2000(3):66—67.

Google Scholar

[3] Han Dajian, Yan Quan Sheng, Chen Shuangbi.Panyu bridge construction control [J].Journal of South China University of Technology,1999(16):1-16.

Google Scholar

[4] Qi Tingting.Jiang six high-speed Beijing Hangzhou Grand Canal Bridge hanging basket construction safety management [J].Shanxi archfecture,2012(10):188-189.

Google Scholar