Validation Control of Construction Cost

Article Preview

Abstract:

Project investment is the most important factor in construction. Project-establishment, design, project bidding and construction phases are the basic stages in construction. According to different phases, scientific investment estimation method, cost engineers participating in design, realistic tender sum limit and strictly overall controlling are the validation methods. Eventually, realize the goal of controlling construction cost.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2650-2653

Citation:

Online since:

January 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] China Engineer Cost Association: Project cost management basic theory and the relevant laws and regulations. China Planning Press, Beijing (2009) in Chinese.

Google Scholar

[2] The Ministry of Housing and Urban-Rural Development of the People's Republic of China: GB50500-2013 code of bills of quantities and valuation for construction works. China Planning Press, Beijing (2013) in Chinese.

Google Scholar

[3] China Engineer Cost Association: project cost and control. China Planning Press, Beijing (2009) in Chinese.

Google Scholar