Improvements in Quality Assurance for Blowout Preventers Assembling/Disassembling and Maintenance Operations

Article Preview

Abstract:

The oil extraction industry presents many hazard related issues and consequently the majority of equipment used in oil well rigs has to present an increased degree of reliability. Within many other pieces of equipment with concerns the most relevant it is the blowout preventer. Any fault of the blowout preventers could lead to major accidents, with serious consequences on oil well rig equipment integrity, personnel health and not the last environmental damages. Based on the pervious presented issues there it is obvious that assembling/disassembling and all the maintenance operations conducted on blowout preventers shall be thoroughly conducted, carefully monitored and well documented in order to avoid any further problem in service. In this article it is presented a new approach in monitoring assembling/disassembling and maintenance operations conducted on blowout preventers. This new approach is based on the facilities offered by Microsoft Project software package and uses the Gantt chart project template as a monitoring tool for different operations conducted on blowout preventers.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

811-815

Citation:

Online since:

June 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] V. Cristea, I. Grădişteanu, N. Peligrad, Instalaţii şi utilaje pentru forarea sondelor, Editura Tehnică, Bucureşti, (1985).

Google Scholar

[2] * * * Technical book horizontal preventers, (2005).

Google Scholar