[1]
Akbulut, M. A. and Yilmaz, A. E., (2009), A modified genetic algorithm for the generalized assignment problems, Journal of Electrical and Electronics Engineering, 9(2), pp.951-958.
Google Scholar
[2]
Archibald, R. B. (1981), The implementation of project management: The professional's handbook. Massachusetts: Addison-Wesley Publishing.
Google Scholar
[3]
Barr, R. S., Glover, F., and Klingdam, D., (1977), The alternating basis algorithm for assignment problems, Mathematical Programming, 13, pp.1-13.
DOI: 10.1007/bf01584319
Google Scholar
[4]
Bass, B. M. (1965), Organizational psychology. Boston: Ally and Bacon.
Google Scholar
[5]
Belbin, R. M., (1981), Management Teams: Why They Succeed or Fail. New York: Butterworth-Heinemann.
Google Scholar
[6]
Belbin, R. M., (2009), http: /www. belbin. com/rte. asp?id=8.
Google Scholar
[7]
Blau, P. M., & Scott, W. R. (1963), Formal organizations. London: Routledge Kegan Paul.
Google Scholar
[8]
Catrysse, D. van Wassenhove, L. N., (1992), A survey of algorithms for the generalized assignment problem, European Journal of Operational Research, 60, pp.260-272.
DOI: 10.1016/0377-2217(92)90077-m
Google Scholar
[9]
Clarke, A. (1999), A practical use of key success factors to improve the effectiveness of project management, International Journal of Project Management, 17( 3), pp.139-145.
DOI: 10.1016/s0263-7863(98)00031-3
Google Scholar
[10]
Cleland, D. I., & King, W. R. (1983), System analysis and project management. NY: McGraw Hill Book Company.
Google Scholar
[11]
Cleland, D. I. (1986), Project owners: Beware, Project Management Journal, 17(5), pp.83-92.
Google Scholar
[12]
Fisher, M. L., Jaikumar, R. and Vanm, W., (1986), A multiplier adjustment method for the generalized assignment problem, Management Science, 32, pp.1095-1103.
DOI: 10.1287/mnsc.32.9.1095
Google Scholar
[13]
Garfinkel, R. S., (1971), An improved algorithm for bottleneck assignment problem, , Operations Research, 18, pp.1717-1751.
Google Scholar
[14]
Geetha, S., and Nair, K. P. K., (1993), A variation of the assignment problem, , European Journal of Operational Research, 68, pp.422-426.
DOI: 10.1016/0377-2217(93)90198-v
Google Scholar
[15]
Katz R. and Allen, T. J., (1985), Project performance and the locus of influence in the R&D matrix, Academy of Management Journal, Vol. 28, No. 1, pp.67-87.
Google Scholar
[16]
Kerzner, H., (1984), Project Management: A system approach to planning scheduling and controlling, NY: Van Nostrand Reinhold.
Google Scholar
[17]
Kerzner, H. (1994), Project management: A systems approach to planning scheduling and controlling, NY: Van Nostrand Reinhold.
Google Scholar
[18]
Kuhn, Harold W., (1955), The Hungarian Method for the assignment problem, , Naval Research Logistics Quarterly, 2, p.83–97.
DOI: 10.1002/nav.3800020109
Google Scholar
[19]
Kuhn, Harold W., (1956), Variants of the Hungarian method for assignment problems, , Naval Research Logistics Quarterly, 3, p.253–258.
DOI: 10.1002/nav.3800030404
Google Scholar
[20]
Hung, M. S., and Rom, W. O., (1980), Solving the assignment problem by relation, , Operations Research, 28, pp.969-982.
DOI: 10.1287/opre.28.4.969
Google Scholar
[21]
Munkres, J., (1957), Algorithms for the Assignment and Transportation Problems, , Journal of the Society for Industrial and Applied Mathematics, 5(1), p.32–38.
Google Scholar
[22]
Mazzola, J. B. and Neebe, A. W., (1993), An algorithm for the bottleneck generalized assignment problem, , Computers and Operations Research, 20, pp.355-362.
DOI: 10.1016/0305-0548(93)90079-x
Google Scholar
[23]
Mazzola, J. B., (1989), Generalized assignment with nonlinear capacity interaction, Management Science, 35, pp.923-941.
DOI: 10.1287/mnsc.35.8.923
Google Scholar
[24]
Mazzola, J. B. and Neebe, A. W., (1988), Bottleneck generalized assignment problems, , Engineering Costs and Production Economy, 14, pp.61-65.
DOI: 10.1016/0167-188x(88)90053-5
Google Scholar
[25]
Neebe, A. W. and Rao, M. R., (1983), An algorithm for the fixed-charge assigning users to sources problem, , Journal of Operations Society, 34, pp.1107-1113.
DOI: 10.1057/jors.1983.242
Google Scholar
[26]
Oya, I. T. and Walter, O. R., (1998), Analysis of the characteristics of projects in diverse industries, Journal of Operations Management, 16(2), pp.43-61.
Google Scholar
[27]
Pinto, J. K. and Slevin, D. P., (1988), Project success: definition and measurement techniques, Project Management Journal, 19(1), pp.67-72.
Google Scholar
[28]
Ravindran, A., and Ramaswamy, V., (1977), On the bottleneck assignment problem, , Journal of Optimization Theory and Applications, 21 (1977), pp.451-458.
DOI: 10.1007/bf00933089
Google Scholar
[29]
Ravindran, A., Phillips, D. T., and Solberg, T. J., (1987), Operations Research: principles and practice, 2nd Edition, John Wiely and Sons.
Google Scholar
[30]
Ross, G. T. and Soland, R. M., (1977), Modeling facility location problems as generalized problems, , Management Science, 24, pp.345-357.
DOI: 10.1287/mnsc.24.3.345
Google Scholar
[31]
Zanakis, S. H., (1983), A staff to job assignment (partitioning) problem with multiple objectives, Computer and Operations Research, 10(4), l, pp.357-363.
DOI: 10.1016/0305-0548(83)90010-2
Google Scholar