The Importance of Lightweight Concrete Technology Development for IBS Industry in Malaysia Based on Cost Comparison between Concrete Slab and Hollow Core Slab: A Case Study of LRT Car Park Project

Abstract:

Article Preview

There are several issues related to the implementation of new Industrialised Building System (IBS) technology in Malaysia which some of them are the awareness among industry players, and lack of development on the new technology in the industry. The main constraint that has always been discussed by the IBS players is time and cost. To have more reliable product or technology in terms of cost and time, it is important to craft and develop new idea as well as technology in our own country. The objective of this study was to highlight the cost comparison between cast in-situ concrete slab and hollow core slab (lightweight) which it can be a starting point for future research on the development of new lightweight IBS technology in Malaysia to get the most reliable cost with latest technology by using local resources. Informations on costs and work durations are collected and analysed between two floors using two different construction methods (hollow core slab and conventional concrete slab). Hollow core slab (lightweight IBS) has similar or less cost with shorter construction period (30% shorter) for the project.

Info:

Periodical:

Edited by:

Abd Nasir B Matori, Zubair Imam Syed, Mohamed Hasnain Isa and Bashar S. Mohammed

Pages:

637-641

Citation:

M. Z. Ramli et al., "The Importance of Lightweight Concrete Technology Development for IBS Industry in Malaysia Based on Cost Comparison between Concrete Slab and Hollow Core Slab: A Case Study of LRT Car Park Project", Applied Mechanics and Materials, Vol. 567, pp. 637-641, 2014

Online since:

June 2014

Export:

Price:

$41.00

* - Corresponding Author

[1] A. B. A. Rahman, & W. Omar, Issues and Challenges In The Implementation of Industrialised Building Systems In Malaysia, Proceedings of the 6th Asia-Pacific Structural Engineering and Construction Conference (2006).

[2] I. Din, IBS Roadmap – Status Towards 2015, The International Constructional Steel Conference (2012).

[3] W.E. Alaghbari, A.K. Razali, S. Azizah, Ernawati, The significant factors causing delay of building construction projects in Malaysia, Engineering, Construction and Architectural Management, Vol. 14(2), p.192 – 206 (2007).

DOI: https://doi.org/10.1108/09699980710731308

[4] M.N.A. Hazem, Plastbau®, Better Way for Build in View of Sustainable Construction, King Abdulaziz City for Science and Technology (2005).

[5] T.K. Chan, Comparison of Precast Construction Costs: Case Studies in Australia and Malaysia, In: C. Egbu, E.C.W. Lou (Eds), Proceedings 27th Annual ARCOM Conference (2011).

[6] T. Lai, Structural Behaviour of BubbleDeck® Slabs and Their Application to Lightweight Bridge Decks, PhD Dissertation, Massachusetts Institute of Technology (2010).

[7] C. Sergiu, G. Roxana, D. Gabriela, Summary of Tests and Studies Done Abroad On The Bubble Deck System, Buletinul Institutului Politehnic Din Iasi, Universitatea Tehnică Gheorghe Asachi din Iaşi (2009).