Main Engineering Geological Problems and Evaluation on the Reservoir Engineering of Yellow River Water Diversion and Irrigation Area

Article Preview

Abstract:

Engineering geology survey was carried out on the reservoir engineering of Yellow River water diversion and irrigation area, main engineering geology problem including leakage problem of reservoir area、shore stable and siltation problem around the reservoir、siltation problem of storehouse district, connected the river course and the pilot, water leakage river course、earthquake liquefication and immerse and salinification were analyzed and appraised, the corresponding project measure was proposed against the infiltrates of the storehouse district.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2071-2073

Citation:

Online since:

July 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] The national standard of the people's Republic of China. Code for water resources and hydropower engineering geological investigation (GB50487-2008)[S]. Beijing: Chinese Planning Press, (2009).

Google Scholar

[2] The national standard of the people's Republic of China. Code for seismic design of buildings (GB50011-2010) [S]. Beijing: China Architecture Industry Press, (2010).

Google Scholar

[3] Zhang Guihua, Zhang YiBing, Tian Yongjun, Hu Shihui. 3D finite element seepage calculation and analysis of Yellow River irrigation reservoir, Henan water conservancy and the south to North Water Diversion Project, 2012, (16): 72-73.

Google Scholar