A Case Study on Pit Failure Risk of Deep Diaphragm Wall
Abstract:
Temporary bracing is often viewed as an unnecessary step in the process of constructing a structural facility. Unfortunately, many times this often-neglected step becomes the subject of avoidable litigation and lawsuits. This paper presents a remedy case of a deep foundation pit during the construction of the bracing system located at the business center in HePing district, TianJin. Through frequent inspection and suitable countermeasures, the potential disaster was mitigated in time. There were some lessons learned from this case history.
Info:
Periodical:
Pages:
1975-1978
Citation:
Online since:
July 2014