p.1956
p.1963
p.1969
p.1975
p.1979
p.1985
p.1992
p.1996
p.2001
Detection and Evaluation of the Tiegou River Bridge in Zhucheng
Abstract:
For the reinforced concrete hollow slab bridge with six spans is in Shandong, Zhucheng province. Through the general inspection, special inspection and checking and analysis of bearing force. We make a comprehensive evaluation of bearing force and working conditions. So it could provide detailed reference material and data for future maintenance.
Info:
Periodical:
Pages:
1979-1984
Citation:
Online since:
July 2014
Authors:
Price:
Сopyright:
© 2014 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: