Investigation of the Cast-In Situ BDF Hollow Floor Construction Quality Guarantee Measures

Article Preview

Abstract:

Based on the project of a university teaching building, according to the construction situation of the Cast-in-situ BDF hollow floor, we analyzes quality defects of the traditional pouring and the Two-time concreting shaping process, and put forward flow construction-crossing pouring technology. Flow construction-crossing pouring technology, effectively guarantees the construction quality of cast-in-suit BDF hollow floor, reduces the quality defect of exposed tendons, holes, honeycomb, pitted.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1963-1968

Citation:

Online since:

July 2014

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Xuesong Liu and Lankun Zhou: Henan building materials, 2011 fourth. (in Chinese).

Google Scholar

[2] Guangning Xu, Hongfeng Zhang, Journal of Yantai Vocational College, Vol. 17 No. 9 Sep. 2011. (in Chinese).

Google Scholar

[3] Xuebing Song, Xiaopeng Wang, Gang Qi and Shengming Liu: Journal of Qingdao Technological University, Vol. 33 No. 6 2012. (in Chinese).

Google Scholar

[4] Jingliang Yu: Guangdong building materials, 2007 fourth. (in Chinese).

Google Scholar

[5] Lili Wang: Shanxi architecture, Vol. 35 No. 5 Feb. 2009. (in Chinese).

Google Scholar

[6] Xiangyun Yan: Shanxi architecture, Vol. 37 No. 6 Feb. 2011. (in Chinese).

Google Scholar

[7] Zhihong Wang: Shanxi architecture, Vol. 38 No. 29 Oct. 2012. (in Chinese).

Google Scholar