Schedule Risk Management of Railway Station Project

Article Preview

Abstract:

Railway station is a comprehensive transportation hub. Its design and construction is far more complex than common public buildings, so as the construction management. This paper mainly explores the schedule risk management of railway station, including risk factors, risk indentation, risk evaluation and risk management. As many similar projects are under construction, Delphi technique method is most favorable for risk indentation. For risk evaluation, risk matrix method and CIM model are recommended to quantify the schedule risk. In the final part, the paper talks about the management of schedule risk. As schedule risk is abstract and its damage relatively slight, the risk prevention and mitigation are most suitable means.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1830-1835

Citation:

Online since:

July 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] G.F. Liu, X.L. Chen: Project Management Technology Vol. 1 (2008), pp.23-26. In Chinese.

Google Scholar

[2] H. Chang, Y.L. Gao: Low Temperature Architecture Technology Vol. 2 (2009), pp.115-117. In Chinese.

Google Scholar

[3] X.H. Li, Y.F. Song: Journal of Engineering Management Vol. 5 (2010), pp.513-516. In Chinese.

Google Scholar

[4] S. Zhang, H. Cheng: Project Management Technology Vol. 8 (2010), pp.24-29. In Chinese.

Google Scholar