The energy consumption of a residential building Zhangjiakou area in different envelope was numerically simulated by using DeST software, and the influence factors on building energy consumption was analyzed, which provides a certain reference for optimization design of building structure Zhangjiakou region.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

247-251

Citation:

Online since:

July 2014

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] air conditioning open time Table 1 Non heating air conditioning season opening time From April 1 st to October 31 st Living room from Monday to Friday: air-conditioning is off during the time of 0:00~12:00 and 14:00~18:00 and the rest time is open on Saturday and Sunday: air-conditioning is open in the whole day Main bedroom from Monday to Friday: air-conditioning is off during the time of 8:00~12:00 and 14:00~18:00 and the rest time is open on Saturday and Sunday: air-conditioning is open in the whole da Second bedroom Kitchen and bath room air-conditioning is off in the whole day Table 2 Air conditioning heating season opening time From November 1st to November 30th From March 1st to March 31 th From December 1st to December 31th From February 1st to February 28th From January 1 st to January 31th Living room from Monday to Sunday: air-conditioning is off during the time of 13:00~17:00 and the rest time is open from Monday to Sunday: air-conditioning is off during the time of 13:00~16:00 and the rest time is open from Monday to Sunday: air-conditioning is off during the time of 13:00~14:00 and the rest time is open Main bedroom Second bedroom Kitchen Bath room

Google Scholar

[2] the air conditioning control temperature setting: 18 ~ 26 ℃

Google Scholar

[3] the tolerable temperature (open air conditioning temperature ) settings:16 ~ 29℃

Google Scholar

[4] the kitchen, bathrooms, heating quarter were not open air conditioning

Google Scholar

[5] the EER of the air-conditioning is 2.3; the winter heating time: November 1st to March 31th, a total of 151 days; the summer air conditioning time: from June 1st to August 30th, a total of 91 days. 2.3 the scheme in the modeling and simulation In this paper, we study the method mainly is the variable parameters method, in external wall, window of the retaining structure, the other retaining structure unchanged under the condition of changing one or multiple making energy saving plan.Envelope energy-saving scheme mainly includes two aspects of wall materials and thermal insulation, glass material, the heat transfer coefficient of wall are shown in table 3, the heat transfer coefficient of glass are shown in table 4, the specific simulation project are shown in table 5. Table 3 The heat transfer coefficient of building external wall External number Structure Thickness(mm) Heat transfer coefficient