Staged Cost Influence Factors Analysis on Power Transmission Project

Article Preview

Abstract:

In order to get the influence mechanism of every factor on power transmission project, the paper divided the project into four stages, namely: decision and feasibility study stage, design and bid stage, construction stage and completion final accounts stage. The paper applies the interpretive structural model (ISM) to analyze the function mechanism among the factors and final forms the interpretive structural diagram.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

883-887

Citation:

Online since:

June 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Luo Xiaoping. Research on reasonable control measure for power transmission project. E-commerce of China, 19 (2013): 237-237.

Google Scholar

[2] Wang Haiqiang. Transmission project cost management and control measures. Construction & Design For Project, 2 (2012): 142-144.

Google Scholar

[3] Chen Xiaolong, Wang Liguang. A Study on estimating approach based on analysis model for design parameters of buildings. Journal of Tongji University (Natural Science), 37(2009): 1115-1121.

Google Scholar

[4] Lu Guimei. Project cost management in construction stage. Value Engineering, 29(2010): 30-30.

Google Scholar