Comparing Mathematical and Heuristic Rules for Solving Single Machine Scheduling Problem with Release and due Date Constraints

Article Preview

Abstract:

The purpose of this paper is to compare a mixed integer programming (MIP) model, and heuristic rules based on their practical efficiency and the accuracy of results to tackle the minimum lateness single machine scheduling problem with release and due date constraints. Extensive numerical experiments are carried out on randomly generated testing instances in order to evaluate the performance of the MIP model and heuristic rules.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1707-1710

Citation:

Online since:

September 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] R L Graham, E L Lawler and J K Lenstra: Annals of Discrete Mathematics Vol. 5 (1979), pp.287-326.

Google Scholar

[2] J Du, J Y T Leung: Mathematics of Operations Research, Vol. 15(1990), pp.483-495.

Google Scholar

[3] Samia Qurari, Cyril Briand and Brahim Bouzouia: Journal of Math. Modelling and Algorithms Vol. 27 (2009), pp.1-15.

Google Scholar

[4] Peng Guo, Wenming Cheng and Yi Wang: Journal of industrial and management optimization, Vol. 10(4) (2014), pp.1071-1090.

Google Scholar

[5] Yuvraj Gajpal, Alok Dua and Shesh Narayan Sahu: Lecture notes in management science, Vol. 6 (2014), pp.99-105.

Google Scholar