Example Analysis on Safety Monitoring of Breakwater Engineering

Article Preview

Abstract:

Setting some projects including surface subsidence, pore water pressure and deep horizontal displacement etc, tracking monitoring soil deformation during construction, and controlling reasonable loading rate are the guarantee of safety and stability of foundation and structure during the construction of south breakwater of industrial park. Monitoring result shows that subsidence and displacement meet the design requirement, with more than 85% of foundation consolidation degree and every controllable parameter index, which achieves stability, safety and informatization construction of breakwater engineering, and guides similar engineering effectively.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1293-1296

Citation:

Online since:

September 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] R. B. Li, Z. L. Dong, Z. Wu: Port & Waterway Engineering, Vol. 388, 84-88 (2006). (In Chinese).

Google Scholar

[2] L. W Kong, H. B. Lu, R. Wang, et al: Chinese Journal of Geotechnical Engineering, Vol. 26, 454-458 (2004). (In Chinese).

Google Scholar

[3] L. Sheng, C. W. Zhao, A. J. Zhuge: China Harbour Engineering, Vol. 141, 72-75 (2006). (In Chinese).

Google Scholar

[4] A. B. Zhong, Z. X. Liu: Highway, Vol. 8, 216-219 (2004). (In Chinese).

Google Scholar

[5] Z. P. Li, Y. T. Zhang: Site Investigation Science and Technology, Vol. 2, 22-24 (2012). (In Chinese).

Google Scholar