Characteristic Analysis and Management of Human Resource in EPC Project

Article Preview

Abstract:

Based on the theory of project management and human resources, combining with the practical construction situations in China, using theoretical analysis and comparative analysis, four important characteristics are extracted in engineering project using EPC mode, that is, mobility, duality, commodity & humanity and collaboration. Furthermore, the origins and implications of above characteristics in depth are analyzed, and some management methods are presented with the guidance in connection with them in theory.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2319-2322

Citation:

Online since:

September 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Li Zengyou, He Jishan. Science&Technology Progress and Policy, Hubei, 2010, 27(19): 7.

Google Scholar

[2] Michael Armstong and Angela Baronl. Performance Management. Cromwell Press, London 1998: 15-52.

Google Scholar

[3] Zhang Bin. Human Resource Management. Nanjing University Press, Jiangsu. 2000: 88-105.

Google Scholar

[4] Jeffrey K Pinto. Project management 2002. Research Technology Management. Washington. 2002: 22-37.

Google Scholar

[5] Janres J Jiang, Gary Klein, Houn-Geo Chen. Project Management Journal, Sylva. 2001: 49-55.

Google Scholar