The Study on Sub-Contract Management in EPC Engineering

Article Preview

Abstract:

The EPC mode is one kind of total engineering management mode. In EPC engineering, the contractor commitments the project design, equipment procurement and construction, etc, which does not mean that general contractor must complete personally the entire construction project. The general contractor of EPC engineering can subcontract a part of the works to some subcontractors. So it is very important for the general contractor to tighten up the management of subcontractors through rules on contract. In the paper, some existing problems in signing stage and performance stage are analyzed. To address the problems, some solutions are put forward, including paying attention to the relevant qualification of the subcontractors audit, setting up warning systems of sub-contract, conducting risk assessment of sub-contract variations, etc.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2342-2345

Citation:

Online since:

September 2014

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Fang Wen, The Shallowly Discussion on Sub-contract Management in EPC Engineering, Market Weekly, 2(2007) 32-33.

Google Scholar

[2] Wuren Wang, the General Contract Management in EPC Engineering, edtied by China Building Industry Press, Beijing(2008) 287.

Google Scholar

[3] Janghuai Cheng, The Discussion on Change Issues of Contract Management, Shanxi Architecture, 36(2013) 286-287.

Google Scholar

[4] Xianjie Zhang, Some Questions about Sub-contract management in construction project, Business Economics, 4(2010) 51-52.

Google Scholar

[5] Hui Ding, the study on Sub-contract management in the petroleum EPC engineering, Scientific management, 4(2010) 196.

Google Scholar