[1]
Yaling Du, The improve research based on governance public project management performance[D]. Tianjin: Tianjin University(2009). In Chinese.
Google Scholar
[2]
Lam K C, Wang D, Patricia T K, et al. International Journal of Project Management(2007). 25(5): 485-493.
Google Scholar
[3]
Loosemore M, R aftery J, Reilly C, et al. Risk management in projects[M].London: Taylor &Francis (2006).
Google Scholar
[4]
Ahmed S M, Ahmad R, De Saram D D. Engineering, Construction and Architectural Management(1999). 6(3): 225-234.
Google Scholar
[5]
Hartman F, Snelgrove P. Journal of Construction Engineering and Management(1996). (9): 291-296.
Google Scholar
[6]
Medda F. International Journal of Project Management(2007). 25(3): 213-218.
Google Scholar
[7]
Rahman M M, Kumarswamy M M. Engineering, Construction and Architectural Management(2002). 9(2): 131-151.
Google Scholar
[8]
Tao He, Guojie Zhao. Systems Engineering(2011). 29 (4): 88-92.
Google Scholar
[9]
Uff J. Risk management and procurement in construction[M].London: Centre of Construction Law and Management(1995).
Google Scholar
[10]
Hoffman S LThe law and business of international project finance—a resource for governments, sponsors, lenders, lawyers and project particapants[M].The Hague: Kluwer Law International(1998).
DOI: 10.1163/9789004502253
Google Scholar
[11]
Wang M T, Asce M, Chou H Y. Journal of Management in Engineering(2003). (4): 60-68.
Google Scholar
[12]
Li Bing, Akintoye A, Edwards P J, et al. International Journal of Project Management(2005). 23: 25-35.
Google Scholar
[13]
Ling Yan, Hua Zhao. China Harbour Engineering(2008). (5): 67-73. In Chinese.
Google Scholar
[14]
Ke, Shouqing Wang, Bingquan Chen. Construction Economy(2008). (4): 31-35. In Chinese.
Google Scholar
[15]
Lucy C. Recent trends in private financing of public infrastructure projects in South Africa[R].South Africa: CSIR Building and Construction Technology(2001).
Google Scholar
[16]
Yongran Li. Engineering contract Contract: Government Procurement and Arbitration Practice [M]. Taipei: Yong Ran Publishing Corporation(2005). In Chinese.
Google Scholar
[17]
Yi Tan, Jifeng Mu. Journal of Public Management, 56-63(2008). In Chinese.
Google Scholar
[18]
Fischer K, et al. Journal of Financial Management of Property and Construction(2010). 15(3): 260-282.
Google Scholar
[19]
Chan J H L, et al.Facilities(2011). 29(13/14): 542-562.
Google Scholar
[20]
Hart O, Moore J. Quarterly Journal of Economics(2008). 123(1): 1-48.
Google Scholar
[21]
Fudenberg D, Tirole J. Econometrica(1990). 58(6): 1279-1319.
Google Scholar
[22]
Pruitt D G, Carnevale P J. Negotiation in social conflict[M].Pacific Grove: Brooks/Cole(1993).
Google Scholar
[23]
Noldeke G, Schmidt K M. Journal of Economics(1995). 26(2): 163-179.
Google Scholar
[24]
Polzer J T, Neale MA. Human Performance(1995). 8: 3-26.
Google Scholar
[25]
Wang Ruqu. European Economic Review(2000). 44: 1577-1597. In Chinese.
Google Scholar
[26]
Albert P.C. Chan, Ada P.L. Chan. Benchmarking: An International Journal(2004). 11(2): 203-221.
Google Scholar
[27]
Yeong, C.M. Time and cost performance of building contracts in Australia and Malaysia[D]. University of South Australia, Australia, Adelaide(1994).
Google Scholar
[28]
Shuibo Zhang, Bosen He. Journal of Tianjin University(2003). 5(3): 257-261. In Chinese.
Google Scholar
[29]
R.G. Koelmans. Project success and performance evaluation[C]. KOELMANS, R.G. International Platinum Conference Platinum Adding Value, The South African Institute of Mining and Metallurgy(2004).
Google Scholar