Study on Risk Allocation and Management Performance Measurement of Construction Project

Article Preview

Abstract:

Recently, risk allocation (RA) has become a research focus as a pre-variable for its damaging to the improvement of project management performance (PMP), but the related measured operations were absence. Based on the theory of incomplete contract, firstly, this paper mapped the initial contract,renegotiation and contract efficiency into the whole process of project RA, constructed a three-stage theoretical models including initial risk allocation (IRA) for contracting , project management performance (PMP) and risk reallocation for contract performance, and depicted their measuring dimensions. Secondly, this paper developed RA measure scale based upon questionnaire design and empirical analysis, and the reliability and validity were analyzed. The research guided significance for contractual arrangements for the project RA and exploring relevance to other variables.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2346-2350

Citation:

Online since:

September 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Yaling Du, The improve research based on governance public project management performance[D]. Tianjin: Tianjin University(2009). In Chinese.

Google Scholar

[2] Lam K C, Wang D, Patricia T K, et al. International Journal of Project Management(2007). 25(5): 485-493.

Google Scholar

[3] Loosemore M, R aftery J, Reilly C, et al. Risk management in projects[M].London: Taylor &Francis (2006).

Google Scholar

[4] Ahmed S M, Ahmad R, De Saram D D. Engineering, Construction and Architectural Management(1999). 6(3): 225-234.

Google Scholar

[5] Hartman F, Snelgrove P. Journal of Construction Engineering and Management(1996). (9): 291-296.

Google Scholar

[6] Medda F. International Journal of Project Management(2007). 25(3): 213-218.

Google Scholar

[7] Rahman M M, Kumarswamy M M. Engineering, Construction and Architectural Management(2002). 9(2): 131-151.

Google Scholar

[8] Tao He, Guojie Zhao. Systems Engineering(2011). 29 (4): 88-92.

Google Scholar

[9] Uff J. Risk management and procurement in construction[M].London: Centre of Construction Law and Management(1995).

Google Scholar

[10] Hoffman S LThe law and business of international project finance—a resource for governments, sponsors, lenders, lawyers and project particapants[M].The Hague: Kluwer Law International(1998).

DOI: 10.1163/9789004502253

Google Scholar

[11] Wang M T, Asce M, Chou H Y. Journal of Management in Engineering(2003). (4): 60-68.

Google Scholar

[12] Li Bing, Akintoye A, Edwards P J, et al. International Journal of Project Management(2005). 23: 25-35.

Google Scholar

[13] Ling Yan, Hua Zhao. China Harbour Engineering(2008). (5): 67-73. In Chinese.

Google Scholar

[14] Ke, Shouqing Wang, Bingquan Chen. Construction Economy(2008). (4): 31-35. In Chinese.

Google Scholar

[15] Lucy C. Recent trends in private financing of public infrastructure projects in South Africa[R].South Africa: CSIR Building and Construction Technology(2001).

Google Scholar

[16] Yongran Li. Engineering contract Contract: Government Procurement and Arbitration Practice [M]. Taipei: Yong Ran Publishing Corporation(2005). In Chinese.

Google Scholar

[17] Yi Tan, Jifeng Mu. Journal of Public Management, 56-63(2008). In Chinese.

Google Scholar

[18] Fischer K, et al. Journal of Financial Management of Property and Construction(2010). 15(3): 260-282.

Google Scholar

[19] Chan J H L, et al.Facilities(2011). 29(13/14): 542-562.

Google Scholar

[20] Hart O, Moore J. Quarterly Journal of Economics(2008). 123(1): 1-48.

Google Scholar

[21] Fudenberg D, Tirole J. Econometrica(1990). 58(6): 1279-1319.

Google Scholar

[22] Pruitt D G, Carnevale P J. Negotiation in social conflict[M].Pacific Grove: Brooks/Cole(1993).

Google Scholar

[23] Noldeke G, Schmidt K M. Journal of Economics(1995). 26(2): 163-179.

Google Scholar

[24] Polzer J T, Neale MA. Human Performance(1995). 8: 3-26.

Google Scholar

[25] Wang Ruqu. European Economic Review(2000). 44: 1577-1597. In Chinese.

Google Scholar

[26] Albert P.C. Chan, Ada P.L. Chan. Benchmarking: An International Journal(2004). 11(2): 203-221.

Google Scholar

[27] Yeong, C.M. Time and cost performance of building contracts in Australia and Malaysia[D]. University of South Australia, Australia, Adelaide(1994).

Google Scholar

[28] Shuibo Zhang, Bosen He. Journal of Tianjin University(2003). 5(3): 257-261. In Chinese.

Google Scholar

[29] R.G. Koelmans. Project success and performance evaluation[C]. KOELMANS, R.G. International Platinum Conference Platinum Adding Value, The South African Institute of Mining and Metallurgy(2004).

Google Scholar