[1]
Yu Yanan, Feng Shiting, Song Liangfeng. Test Study on the Super-long Bored Pile in Soft Ground, J. Industrial Construction, 2002, (11): 33-35. (in Chinese).
Google Scholar
[2]
Zhu Xiangrong, Fang Pengfei, Huang Hongmian. Research on super-long pile in soft clay, J. Chinese Journal of Geotechnical Engineering, 2002, 25(1): 76-79. (in Chinese).
Google Scholar
[3]
Huang Mingong, Gong Xiaonan, Zhao Shanrui . Styles of Test Curves and Damage Mechanism of Long Bored Piles, J. Journal of the China Railway Society, 1998, 20(4): 93-97. (in Chinese).
Google Scholar
[4]
Chen Peizhen, Luan Maotian, Luo Qiang. Parametric Finite Element Analysis of Effective Pile-length in Super-long and Large-diameter Pile Groups, J. Journal of Graduate University of Chinese Academy of Sciences, 2012(3): 22-26. (in Chinese).
Google Scholar
[5]
Long Zhaoyang. Calculation and Analysis of Effective Length for Single Piles, J. Highway Engineering and Transportation, 2009(9): 29-33. (in Chinese).
Google Scholar
[6]
Pile Foundation Engineering Handbook, M. Beijing: China Building Industry Press, 1995: 144-156. (in Chinese).
Google Scholar
[7]
Ding Jianwen, Liu Songyu. Discussion on Effective Length of Super-long Pile [J]. Journal of Highway and Transportation Research and Development, 2006(10): 87-89. (in Chinese).
Google Scholar
[8]
Wang Gaoke, Wang Guotao, Zhang Chun. Research on Effective Length of Super-long Single Pile, J. Transportation Science&Technology, 2008(1): 48-49. (in Chinese).
Google Scholar
[9]
Duan Jiwei, Gong Xiaonan, Zeng Guoxi. Load Transfer Behavior of Cement Treated Soil Column, J. Journal of Rock Mechanics and Geotechnical Engineering, 1994, 16(4): 1-7. (in Chinese).
Google Scholar