Model Test of the Riverbed Deformation for the Flood Control Project of Chengde Reaches of Luanhe River

Article Preview

Abstract:

The flow field variation and the riverbed deformation of Chengde reaches of Luanhe river before and after the construction of the embankment and dam engineering were studied by the river model test. The results showed that the dike layout was reasonable, the designed erosion control measures can resist the local scour, and the dam reduced the scouring. So the maximum erosion depth near the left and right dike was decreased by 3.0m and the average depth reduction was 0.9m. Under the dam project conditions, the deep scour pit at the dike toe with the maximum scouring depth of 4.0 - 5.0m was shaped. Such erosion control measures as the fuseplugspillway form is suggested to reduce the erosion significantly.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

191-195

Citation:

Online since:

September 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Yujia Hui and Guixian Wang. River model test[M]. China WaterPower Press, Beijing, China, 1999. (in Chinese).

Google Scholar

[2] Ruijin Zhang and Jianheng Xie. River sediment dynamics[M]. WaterPower Press, Beijing, China, 1989. (in Chinese).

Google Scholar

[3] Jianheng Xie. Rivers simulation[M]. WaterPower Press, Beijing, China, 1990. (in Chinese).

Google Scholar

[4] Dongpo Sun, Erping Wang and Jun Yan, et al. river channel model test report of the flood control works of Chengde reach of Luanhe river[R]. North China Institute of Water Conservancy and Hydropower, Zhengzhou, China, 2006. (in Chinese).

Google Scholar