Study of Crew Scheduling System for High-Speed Railway

Article Preview

Abstract:

We discussed the crew scheduling rules for High-speed railway in China. These rules are mainly relates to crew members and railway operators. One of the aims to establish the rules is to protect the legitimate rights and interests of crew members, and the other is to reduce the operating cost as possible. The idea of biological evolution for engineering optimization problems has been developed for years, the applicability of different algorithms were compared to solve this problem. It shows that simulated evolution method is more applicable and then discussed the main steps of using method SE method to deal with this problem. Finally, based on the computer technology, we designed a prototype system.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

72-75

Citation:

Online since:

October 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Peng Zhao, Anzhou Hu, Hao Yang: Journal of the China Railway Society. Vol. 20 (1998), p.8, In Chinese.

Google Scholar

[2] Xianzhong Li, RuihuaXu: Journal of the China Railway Society. Vol. 29 (2007), p.1, In Chinese.

Google Scholar

[3] Supo Zhang, HongxiaLv, Shuhui Liu: Railway Transport and Economy. Vol. 29 (2007), p.19, In Chinese.

Google Scholar

[4] Jungang Shi, Hongjie Shi, RuihuaXu: Journal of the China Railway Society. Vol. 36(2014), p.1, In Chinese.

Google Scholar