Investment Decisions Based on the Postponed Options PROT Hydropower Project

Article Preview

Abstract:

The analysis and description of the current method used in hydropower project investment decisions and problems of the introduction of the Monte Carlo simulation method PROT hydropower project valuation. Examples of analysis results showed that: this method can better reflect the actual value of the uncertainty of hydropower projects, flexibility and projects to provide a reasonable basis for decision makers.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2098-2105

Citation:

Online since:

October 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Nguyen and risk-based research in the concession of a three-dimensional model of the Hall PROT small hydropower projects [J] Kunming University of Science: Social Science Edition, 2013, 13 (1) : 63-71.

Google Scholar

[2] Zhu Min, For thinking PROT hydropower project based on real option valuation [J] Kunming University of Science and Technology: Natural Science Edition, 2014, 39 (1) : 110-113.

Google Scholar

[3] Liuyao Fang, Liu made full. Preliminary application of real options in water conservancy project investment decision [J]. Water Economy, 2005. 23 (5) : 14-16.

Google Scholar

[4] Liu Wei, Zhang Xueping. Real options in the BOT project investment in hydropower applications [J]. Technical and economic, 2007, 26 (12) : 74-77.

Google Scholar

[5] Liu Yaofang. Real options theory in water conservancy construction project investment decision application [D]. Xi'an University of Technology, (2006).

Google Scholar

[6] Yang Yi, Guo Ming Liang, Hu Wenxiu. Real options in infrastructure BOT project investment decision. Industrial Engineering [J]. 2007, 11: 87-90.

Google Scholar

[7] Guo Ming-Liang. BOT infrastructure projects of the government guarantee option game. Xi'an University 2007 Master's thesis.

Google Scholar

[8] Liu Ning, wearing a large double, Miss West Coast Review of BOT Project Evaluation Method of Real Option [J] Dalian University of Technology: Social Science Edition, 2010, 31 (3) : 34-39.

Google Scholar

[9] Huang Ge, Yang Gaosheng. Applications trigeminal hydropower project investment decision tree option pricing model [J]. Engineering construction, 2009, 41 (5) : 20-25.

Google Scholar

[10] Wu liYang, Wei Rong real estate investment decision model developed real option [J] Based Wuhan University of Technology: Information & Management Engineering, 2006, 28 (10) : 105-108.

Google Scholar