[1]
Nguyen and risk-based research in the concession of a three-dimensional model of the Hall PROT small hydropower projects [J] Kunming University of Science: Social Science Edition, 2013, 13 (1) : 63-71.
Google Scholar
[2]
Zhu Min, For thinking PROT hydropower project based on real option valuation [J] Kunming University of Science and Technology: Natural Science Edition, 2014, 39 (1) : 110-113.
Google Scholar
[3]
Liuyao Fang, Liu made full. Preliminary application of real options in water conservancy project investment decision [J]. Water Economy, 2005. 23 (5) : 14-16.
Google Scholar
[4]
Liu Wei, Zhang Xueping. Real options in the BOT project investment in hydropower applications [J]. Technical and economic, 2007, 26 (12) : 74-77.
Google Scholar
[5]
Liu Yaofang. Real options theory in water conservancy construction project investment decision application [D]. Xi'an University of Technology, (2006).
Google Scholar
[6]
Yang Yi, Guo Ming Liang, Hu Wenxiu. Real options in infrastructure BOT project investment decision. Industrial Engineering [J]. 2007, 11: 87-90.
Google Scholar
[7]
Guo Ming-Liang. BOT infrastructure projects of the government guarantee option game. Xi'an University 2007 Master's thesis.
Google Scholar
[8]
Liu Ning, wearing a large double, Miss West Coast Review of BOT Project Evaluation Method of Real Option [J] Dalian University of Technology: Social Science Edition, 2010, 31 (3) : 34-39.
Google Scholar
[9]
Huang Ge, Yang Gaosheng. Applications trigeminal hydropower project investment decision tree option pricing model [J]. Engineering construction, 2009, 41 (5) : 20-25.
Google Scholar
[10]
Wu liYang, Wei Rong real estate investment decision model developed real option [J] Based Wuhan University of Technology: Information & Management Engineering, 2006, 28 (10) : 105-108.
Google Scholar