Functions and Theoretical Basis of Partial Discharge On-Line Monitoring System for High-Voltage Cables

Article Preview

Abstract:

A partial discharge (PD) on-line monitoring and positioning system for high-voltage cables based on double-ended testing technology is developed. The hardware of this system includes a high-frequency current sensor, site PD signal acquisition and PD monitoring server. In order to achieve real-time monitoring and remote diagnostics of the XLPE cable partial discharge status, the designed software system is divided into front-end control system and remote diagnostic system. And finally, the correctness and effectiveness of the system is verified by XLPE cable partial discharge testing.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

854-857

Citation:

Online since:

October 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Lu Zhixiong, etc.: Hubei Electric Power, Vol. 2, No. 4 (2004), pp.32-35.

Google Scholar

[2] Sui Huibin, etc.: Journal of Shandong University: Engineering Science, Vol. 42, No. 4 (2012), pp.126-131.

Google Scholar

[3] Liu Pingyuan, etc.: High voltage engineering, Vol. 27, No. 4 (2001), pp.26-28.

Google Scholar

[4] Luo Junhua, etc.: High voltage engineering, Vol. 25, No. 4 (1999), pp.32-34.

Google Scholar

[5] Chen Qiaoyong, etc.: Insulating Materials, Vol. 4 (2003), pp.51-54.

Google Scholar

[6] QIN Jian, etc.: International Electric Power For China, Vol. 4 (2001), pp.31-35.

Google Scholar