Analysis and Countermeasures of Value Side Bushing Fault of Converter Transformer in Gezhouba to Nanqiao HVDC Transmission Project

Article Preview

Abstract:

Converter transformer is one of the most important equipments of UHVDC power transmission system, its faults directly affects the safe and stable operation of DC system. The valve winding of converter transformer needs to withstand the voltage that consist of DC voltage and serious distortion of AC voltages (harmonic bound) which are similar to the AC sine waveform compound voltage, so in the design and manufacture of the valve side of converter transformer, bushing is much more complex and difficult than alternating current casing.Valve bushing is weak spot of converter transformer insulation. Through the anatomy of failure bushing, the reason of bushing failure is analyzed. Without changing body size of the converter transformer, the bushing of new structure is developed and the old bushing is replaced to improve the reliability of equipment operation.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

870-876

Citation:

Online since:

October 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] CIGRE JTF 12/14 10-01,In Service Performance of HVDC Converter Transformers and Oil-cooled Smoothing Reactors [J]. Electra, 1994(155): 7-32.

Google Scholar

[2] CHRISTOFERSEN J. Analysis of HVDC Thyristor Converter Transformer Performance [R]. [S. I]: CIGRE Joint Task Force B4. 04/A2-1, (1999).

Google Scholar

[3] Jin Zheng, Kaicheng Wen . Analysis on value side bushing of converter transformer outlet device[J] High voltage technology, 2010, 36(5): 1184-1190.

Google Scholar

[4] Equipment running status and health assessment on Gezhouba and Nnqiao Converter station.

Google Scholar