Analysis the Cable Replacement Method of Tianjin Yonghe Bridge

Article Preview

Abstract:

Taking Tianjin Yonghe bridge for example, the finite element method is adopted to simulate each stages of cable replacement process, the dates of tension, the alignment of main beam and the change of stress before and after cable replacement are compared and analysed, The measured value is greatly consistent with calculated value, Stress state of the bridge has been greatly improved, the weight of main beam bearing by the cable will be shared by a few closed cable after unloading, so the cables which are more serious corroded should be replaced.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1383-1387

Citation:

Online since:

July 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] XU. J, SHI. J J, Cable tension monitoring in the cable replacement process of Jinan Yellow River Highway Bridge, J. Journal of Tongji University of Science and Technology. 26 (1998) 471-475.

Google Scholar

[2] XIE. Y H, ZHANG. C H, Construction technique of stayed-cable replacement, J. Pre-stressed technology. 4 (2008) 14-19.

Google Scholar

[3] TAN. X Q, Analysis of cable replacement project to Three Dadi Nujiang bridge, J. Chinese and foreign Highway. 26 (2006) 130-133.

Google Scholar

[4] SUN. Q S, LI. J H, Research of reasonable stressful condition to stayed-cable replacement, J. Highway. 4 (2010) 86-89.

Google Scholar

[5] TANG. J S, DA. P, Discussion of stayed-cable replacement in construction monitoring technique, J. Bridge Construction. 1(2005) 65-68.

Google Scholar

[6] LI. H J, LI. W H, ZHANG. J Q, Service and reinforcement for Tianjin Yonghe Bridge, J. World Bridge. 1(2009) 53-56.

Google Scholar