Calculation of Shrinkage-Creep Analysis for Long-Span Concrete Continuous Rigid Frame Bridge

Article Preview

Abstract:

Take Longtan river super large bridge as example,establishing finite element model with Bridge Doctor to analysis the influence shrinkage and creep.The deformation prediction of the bridge in the construction process and after completion was made based onseveral.Each prediction results were analyzed and compared.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1511-1515

Citation:

Online since:

July 2011

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] JunZhang, VictorC. Li, HenrikStang. Size Efeton Fatiguein Bending of Concrete[J]. Journal of Bridge Engineering. 2001, 13(6): 446-453.

Google Scholar

[2] M. A rockiasamy, N arongrit Butrieng, M. Sivakumar. State-of-the-Art of Integral Abutment Bridges: Design and Pratice[M]. Journal of Bridge Engineering. 2004, 9(5):497-506.

DOI: 10.1061/(asce)1084-0702(2004)9:5(497)

Google Scholar

[3] Bazant.Z. P, Wittmann F H. Creep and shrinkage in concretestructures[J].New York: John Wiley & Sons, 1982: 129-358.

Google Scholar

[4] Ghal..I.A. Favrer.Concrete structure: stresses and deformations[J].New York:Chapman and Hall, 1986: 78 - 82.

Google Scholar

[5] Ponter A.R. S.Hayhurst.D.R.Creep in structures[J].Berlin: Springer 2 Verlag, 1981: 1-49.

Google Scholar

[6] Lain F, William R H. Creep of engineering materials[M]. New York: McGraw - Hill Book Company, 1959: 33-62.

Google Scholar