p.1488
p.1495
p.1499
p.1507
p.1511
p.1516
p.1522
p.1528
p.1532
Calculation of Shrinkage-Creep Analysis for Long-Span Concrete Continuous Rigid Frame Bridge
Abstract:
Take Longtan river super large bridge as example,establishing finite element model with Bridge Doctor to analysis the influence shrinkage and creep.The deformation prediction of the bridge in the construction process and after completion was made based onseveral.Each prediction results were analyzed and compared.
Info:
Periodical:
Pages:
1511-1515
Citation:
Online since:
July 2011
Authors:
Keywords:
Price:
Сopyright:
© 2011 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: