Ultra-Short-Term Forecasting Based on Phase Space Reconstruction and Wind Power Wind

Article Preview

Abstract:

The amount of random variation of wind speed, wind turbine output power are volatile, a lot of wind power will be on the safe and stable operation of power systems and power quality pose serious challenges, so the wind farm wind speed and power generation forecast scheduling and management of wind farms play an important role. According wind with chaotic discuss the use of phase space CC method to reconstruct the chaotic time series, and the phase space of a wind farm 10 units were reconstructed using the weighted first order local prediction model to obtain short-term within 1h wind forecast values obtained using the power curve conversion method of generating power for each unit. By examples show that the proposed method is feasible and effective.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1444-1447

Citation:

Online since:

January 2015

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2015 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Yangxiu Yuan, Xiao Yang, PROCEEDINGS. Wind farm wind speed and power output prediction [J]. China CSEE, 2005, 25 (11): 1 - 5.

Google Scholar

[2] Liu ago, Han Shuang, Hu Yongsheng. Summary of wind farm output short-term prediction research [J]. Modern electric power, 2007, 24 (5): 6 - 11.

Google Scholar

[3] Wang Lijie, Liao Zhong, GAO, and so on. Grid-type large-scale wind farm wind power - Chaotic property analysis of time series [J]. Beijing Institute of Technology, 2007, 27 (12): 1077-1080.

Google Scholar

[4] Lu Tao, Tang Wei, the Korea. Reconstruction phase space based on chaos theory of short-term wind forecasting wind farm [J]. Power Power system protection and control, 2010, 38 (21): 113-117.

Google Scholar

[5] Luo ocean, LIU Tian-qi, PROCEEDINGS. Chaos short-term wind forecasting of wind farms [J]. Power System Technology, 2009, 33 (9): 67 - 71.

Google Scholar

[6] Lvjin Hu. Chaotic time series analysis and its application [M]. Wuhan: Wuhan University Press, (2002).

Google Scholar

[7] Li Cun Army, Deng Hongxia, Liu Zheng. Prediction [J] Volterra model based on monthly runoff. People of the Yellow River, 2007, 29 (4): 23 - 24.

Google Scholar

[8] Cai Feng, Wan Lin, Shi Aiguo. Based on Phase Space Reconstruction ship Extreme short term prediction [J]. Hydrodynamics Research and Development, 2005, 20 (6): 780-784.

Google Scholar