Analysis Fracture Failure Analysis of Drill Pipe’s Tool Joint

Article Preview

Abstract:

One drill pipe’ tool joint fractured rarely after just servicing ten days in drilling process of one natural gas well. Failure reason of tool-joint pin was researched through visual inspection, mechanical properties testing and working condition analysis. Results show that fracture failure reason is mainly due to the dramatic friction between the tool joint and the accumulated debris during the drill-string’s rotating process. Accumulated debris blocked mud’s circulation channel and leaded to poor circulation. The dramatic friction between the tool joint and accumulated debris leaded tool joint’s local temperature to risen significantly, and reduced its carrying capacity. In the end, tool joint fractured under the effect of tensile and torsional loads.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

65-68

Citation:

Online since:

January 2015

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2015 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] LI He-lin, Li Ping-quan, Feng Yao-rong. Petroleum Drill String Failure Analysis and Prevention [M]. Beijing: Petroleum Industry Press , (1999).

Google Scholar

[2] API Spec 5DP: 2010 Specification of Drill Pipe,. American Petroleum Institute, [S].

Google Scholar

[3] ISO 10424-2: 2007 Thread and gauging of rotary shouldered thread connections,. International Organization for Standardization, [S].

Google Scholar

[4] Cui Zhongqi, Tan Yaochun. Heat treatment of metals [M]. machinery industry press. 2008. 4: 243-260.

Google Scholar

[5] WANG Guang-sheng, Shi Hong. Defect Analysis in Metal Heat treatment [M]. Beijing: Mechanical Industry Press, (2007).

Google Scholar