Research on Alignment Control of Cable-Stayed Bridge during Construction

Article Preview

Abstract:

Measured values of alignment deviate significantly from the predicted ones partially of a cable-stayed bridge before closure. The root-cause was analyzed and a correction program was proposed in this paper. Unreliable anchoring and instable deformation of hanging basket resulted from the difference between hanging basket structure and construction requirements are the main cause. It is difficult to adjust cable force under cantilever state and it is feasible to adjust cable force and height after the bridge is setup.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

465-469

Citation:

Online since:

December 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2015 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Liu Shilin. Cable stayed bridge. Beijing: China Communications Press, (2002).

Google Scholar

[2] Yan Guomin. Modern cable-stayed bridge. Chengdu: Southwest Jiao Tong University press, (1995).

Google Scholar

[3] Wang Jinfeng. Construction control key technology research of prestressed concrete cable-stayed bridge. doctoral dissertation of Zhejiang University, (2003).

Google Scholar