An Optimization Method Selecting the Location Points for Drilling and Riveting of Aircraft’s Wing Panel

Article Preview

Abstract:

In order to select the optimal location points for automated drilling and riveting process, an optimization method selecting the location points of Aircraft’s Wing Panel in Automatic Drilling and Riveting System is presented. This method includes three steps: 1) building the matching model based on the multiplicity; 2) presenting the matching method based on scatter search algorithm; 3) selecting the optimal location points according to the minimal deviation based on linear programming method. This method was applied in a panel to match the mathematical surface and the fitting one of this panel perfectly and select the optimal location points. The efficacy and quality during the process of drilling and riveting of this panel was improved greatly.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1103-1108

Citation:

Online since:

July 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] MA Deng-liang. Study on Parameters Optimization of Numerical Control Simulation Milling Based on Grid Method. Machine Tool & Hydraulics 2007, 35(12), pp.77-79.

Google Scholar

[2] ZHU Jun-hui, CHENG Chun-rui. Domain Decomposition Methods for a Kind of Optimization Problem. Journal of Chongqing Institute of Technology(Natural Science Edition), 2008, 22(2), pp.78-81.

Google Scholar

[3] CHEN Ping, HUANG Hou-kuan, DONG Xing-ye. A Multi-Operator Based Iterated Local Search Algorithm for the Capacitated Vehicle Routing Problem. Journal of Beijing Jiaotong University, 2009, 33(2), pp.1-5.

Google Scholar

[4] XU Xu-song, YANG Jiang-xin, CAO Yan-long, MAO Jian. Manufacturing error modeling based on homogeneous transformation. Journal of Zhejiang University (Engineering Science), 2008, 42(6), pp.1021-1026.

Google Scholar

[5] D S Yamashita, V A Armentano, M Laguna. Scatter search for project scheduling with resource availability cost. European Journal of Operational Research, 2006, 169(2), pp.623-637.

DOI: 10.1016/j.ejor.2004.08.019

Google Scholar