Abstract:

Elastic modulus and temperature are the main influences of dam stress. In order to study the Dongjiang dam stress for crack controlling, the critical parts stress of dam under different elastic modulus and high-low temperature seasons is analyzed by the finite element method. The results show that: (1) the arch crown and abutment principal tensile stress at upstream face and principal compressive stress at downstream face under high temperature season are greater than the calculation results under low temperature season for the whole at the normal storage water level; (2) the influence on stress caused by elastic modulus are more significant under high temperature season compared to low temperature season at arch crown and abutment, the maximum stress increase with the increasing of elastic modulus. (3) Dongjiang arch dam should pay more attention to the safety control under high temperature season and surface crack prevention and control work in low temperature season.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

780-784

Citation:

Online since:

August 2016

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2016 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Lin, Peng, Weiyuan Zhou, and Hongyuan Liu. Experimental study on cracking, reinforcement, and overall stability of the Xiaowan super-high arch dam., Rock mechanics and rock engineering. 2015, 48(2): 819-841.

DOI: 10.1007/s00603-014-0593-x

Google Scholar

[2] Liu Y R, He Z, Deng J Q, et al. Long-Term Stability Analysis for High Arch Dam Based on Time-Dependent Deformation Reinforcement Theory[C]/49th US Rock Mechanics/Geomechanics Symposium. American Rock Mechanics Association, (2015).

DOI: 10.1061/(asce)gm.1943-5622.0000760

Google Scholar

[3] Xia Y, Li C, Zhao X, et al. Mechanism Research of Arch Dam Abutment Forces during Overload[J]. Mathematical Problems in Engineering, 2015, 2015: 1-12.

DOI: 10.1155/2015/721602

Google Scholar

[4] ZHU Shuang-lin, CHANG Xiao-lin. Three-dimensional FEM Simulation Analysis of Structural Stress for the Dongping Arch Dam [J]. China rural water and hydropower. 2005, 5: 68-69.

Google Scholar

[5] GONG Yu-feng, Ding Xu-liu. Finite element analysis of double curvature arch dam [J]. China rural water and hydropower. 2006, 10: 95-96.

Google Scholar

[6] LIANG Jian, LIU Quanhong, ZHANG Chao, etc. all. Equivalent stress calculation of composite type arch dam based on ANSYS [J]. Yangtze River. 2015, 46(12): 4-7.

Google Scholar

[7] Tian Yu. The Dam Profile Design and Stress Analysis of Dongjiang Double Curvature Arch Dam[J]. Journal of hydraulic engineering, 1983, 6: 9~20.

Google Scholar

[8] Mid-South Design&Research Institute. Dam safety periodic inspection design review report of Dongjiang hydropower station of Hunan Province [R]. Changsha: Mid-South Design&Research Institute, (1998).

Google Scholar

[9] LIU Wen-yan. YE Wen-yin, GE Hui, etc. all. Distribution of concrete mechanics performance test research of Dongjiang arch dam [J]. Water Resources and Hydropower Engineering. 1986, 5: 8-14.

Google Scholar

[10] ZHU Bo-fang. Thermal Stresses and Temperature Control of Mass Concrete (second edition) [M]. China water conservancy and hydropower press, (2012).

Google Scholar