Scheduling of Machines and Automated Guided Vehicles in FMS Using Gravitational Search Algorithm

Article Preview

Abstract:

A new meta-heuristic gravitational search(GS) algorithm is proposed for simultaneous scheduling of machines, and two identical automated guided vehicles(AGVs) in a flexible manufacturing system(FMS). It minimize the makespan and completes the assigned jobs faster with possible savings of the resources. The adequacy of the algorithm is demonstrated by solving several problems and comparing with existing results.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

307-313

Citation:

Online since:

July 2017

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2017 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] M.S. Akturk,H. Yilmaz, Scheduling of automated guided vehicles in a decision making hierarchy, International Journal of Production Research, 32 (1996) 577–591.

DOI: 10.1080/00207549608904920

Google Scholar

[2] I. Sabuncuoglu, D.L. Hommertzheim, Experimental investigation of FMS machine and AGV scheduling rules against the mean flow time criterion. Inter: journal of production research, 30(7) (1992) 1617-1635.

DOI: 10.1080/00207549208948110

Google Scholar

[3] S. Karabtik, I. Sabuncuolu, A beam search based algorithm for scheduling machines and AGVs in an FMS. In: Proceedings of the Second Industrial EngineeringResearchConf, Los Angeles, (1993) 308–312.

Google Scholar

[4] Kusiaka, Material Handling in Flexible Manufacturing Systems. Material Flow, 2 (1985) 90-95.

Google Scholar

[5] H.A. El-Maraghy and T. Ravi, Modern tools for the design, modeling and evaluation of flexible manufacturing systems, Int J Robot Comput Integr Manuf, 9(4) (1992) 335–340.

Google Scholar

[6] E. Orhan,D. Alper, A new approaches to solve hybrid flow shop scheduling problems by artificial immune system, Future Generation Computer Systems, 20 (2004) 1083–1095.

DOI: 10.1016/j.future.2004.03.014

Google Scholar

[7] S.M. Lee H.J. Jung, A multi-objective production planning model in a flexible manufacturing environment. Int J Prod Res, 27(11) (1989) 1981–(1992).

Google Scholar

[8] N. Raman, F.B. Talbot, R. Rachamadgu, Simultaneous scheduling of machines and material handling devices in automated manufacturing, In: Proc Second ORSA/TIMS Conf. on FMS (1986).

Google Scholar

[9] J. Blazewicz, H.A. Eiselt, G. Finke, G. Laporte,J. Weglarz, Scheduling tasks and vehicles in a flexible manufacturing system, Int J Flex Manuf Syst, 4 (1991) 5–16.

DOI: 10.1007/bf01325094

Google Scholar

[10] I. Sabuncuogluand, D.L. Hommertzheim, Dynamic dispatching algorithm for scheduling machines and automated guided vehicles in a flexible manufacturing system, Int J Prod Res, 30 (1992) 1059–1079.

DOI: 10.1080/00207549208942943

Google Scholar

[11] U. Bilge and G. Ulusoy, A time window approach to simultaneous scheduling of machines and material handling system in an FMS, Operations Research, 43(6) (1995) 1058–1070.

DOI: 10.1287/opre.43.6.1058

Google Scholar

[12] G. Ulusoy, F. Sivrikayaserifoglus, U. Bilge, A genetic algorithm approaches to the simultaneous scheduling of machines and AGVs, Com: Operations Research, 24(4) (1997) 335–351.

DOI: 10.1016/s0305-0548(96)00061-5

Google Scholar

[13] M. Nageswararao,K. Narayanarao,G. Ranagajanardhana, Simultaneous Scheduling of Machines and AGVs in Flexible Manufacturing System with Minimization of Tardiness Criterion, Procedia Material science, 5 (2014) 1492 – 1501.

DOI: 10.1016/j.mspro.2014.07.336

Google Scholar

[14] MedikonduNageswararao,K. Narayanarao,G. Ranagajanardhana"Hybrid Meta Heuristic Algorithm for Simultaneous Scheduling of Machines and AGVs in Flexible Manufacturing Environment" Canadian Journal of Basic and Applied Sciences, 03(02) (2015) 29-44.

Google Scholar

[15] E. Rashedi, H. Nezamabadi-pour and S. Saryazdi, GSA: A Gravitational Search Algorithm, Information Sciences, 179 (2009) 2232–2248.

DOI: 10.1016/j.ins.2009.03.004

Google Scholar

[16] B. Schutz, Gravity from the Ground Up, Cambridge University Press, (2003).

Google Scholar

[17] D. Holliday, R. Resnick , J. Walker, Fundamentals of physics, John Wiley and Sons. (1993).

Google Scholar

[18] R. Mansouri, F. Nasseri,M. Khorrami, Effective time variation of G in a model universe with variable space dimension, Physics Letters, 259 (1999) 194–200.

DOI: 10.1016/s0375-9601(99)00449-1

Google Scholar

[19] I.R. Kenyon General Relativity, Oxford University Press. (1990).

Google Scholar