[1]
M.S. Akturk,H. Yilmaz, Scheduling of automated guided vehicles in a decision making hierarchy, International Journal of Production Research, 32 (1996) 577–591.
DOI: 10.1080/00207549608904920
Google Scholar
[2]
I. Sabuncuoglu, D.L. Hommertzheim, Experimental investigation of FMS machine and AGV scheduling rules against the mean flow time criterion. Inter: journal of production research, 30(7) (1992) 1617-1635.
DOI: 10.1080/00207549208948110
Google Scholar
[3]
S. Karabtik, I. Sabuncuolu, A beam search based algorithm for scheduling machines and AGVs in an FMS. In: Proceedings of the Second Industrial EngineeringResearchConf, Los Angeles, (1993) 308–312.
Google Scholar
[4]
Kusiaka, Material Handling in Flexible Manufacturing Systems. Material Flow, 2 (1985) 90-95.
Google Scholar
[5]
H.A. El-Maraghy and T. Ravi, Modern tools for the design, modeling and evaluation of flexible manufacturing systems, Int J Robot Comput Integr Manuf, 9(4) (1992) 335–340.
Google Scholar
[6]
E. Orhan,D. Alper, A new approaches to solve hybrid flow shop scheduling problems by artificial immune system, Future Generation Computer Systems, 20 (2004) 1083–1095.
DOI: 10.1016/j.future.2004.03.014
Google Scholar
[7]
S.M. Lee H.J. Jung, A multi-objective production planning model in a flexible manufacturing environment. Int J Prod Res, 27(11) (1989) 1981–(1992).
Google Scholar
[8]
N. Raman, F.B. Talbot, R. Rachamadgu, Simultaneous scheduling of machines and material handling devices in automated manufacturing, In: Proc Second ORSA/TIMS Conf. on FMS (1986).
Google Scholar
[9]
J. Blazewicz, H.A. Eiselt, G. Finke, G. Laporte,J. Weglarz, Scheduling tasks and vehicles in a flexible manufacturing system, Int J Flex Manuf Syst, 4 (1991) 5–16.
DOI: 10.1007/bf01325094
Google Scholar
[10]
I. Sabuncuogluand, D.L. Hommertzheim, Dynamic dispatching algorithm for scheduling machines and automated guided vehicles in a flexible manufacturing system, Int J Prod Res, 30 (1992) 1059–1079.
DOI: 10.1080/00207549208942943
Google Scholar
[11]
U. Bilge and G. Ulusoy, A time window approach to simultaneous scheduling of machines and material handling system in an FMS, Operations Research, 43(6) (1995) 1058–1070.
DOI: 10.1287/opre.43.6.1058
Google Scholar
[12]
G. Ulusoy, F. Sivrikayaserifoglus, U. Bilge, A genetic algorithm approaches to the simultaneous scheduling of machines and AGVs, Com: Operations Research, 24(4) (1997) 335–351.
DOI: 10.1016/s0305-0548(96)00061-5
Google Scholar
[13]
M. Nageswararao,K. Narayanarao,G. Ranagajanardhana, Simultaneous Scheduling of Machines and AGVs in Flexible Manufacturing System with Minimization of Tardiness Criterion, Procedia Material science, 5 (2014) 1492 – 1501.
DOI: 10.1016/j.mspro.2014.07.336
Google Scholar
[14]
MedikonduNageswararao,K. Narayanarao,G. Ranagajanardhana"Hybrid Meta Heuristic Algorithm for Simultaneous Scheduling of Machines and AGVs in Flexible Manufacturing Environment" Canadian Journal of Basic and Applied Sciences, 03(02) (2015) 29-44.
Google Scholar
[15]
E. Rashedi, H. Nezamabadi-pour and S. Saryazdi, GSA: A Gravitational Search Algorithm, Information Sciences, 179 (2009) 2232–2248.
DOI: 10.1016/j.ins.2009.03.004
Google Scholar
[16]
B. Schutz, Gravity from the Ground Up, Cambridge University Press, (2003).
Google Scholar
[17]
D. Holliday, R. Resnick , J. Walker, Fundamentals of physics, John Wiley and Sons. (1993).
Google Scholar
[18]
R. Mansouri, F. Nasseri,M. Khorrami, Effective time variation of G in a model universe with variable space dimension, Physics Letters, 259 (1999) 194–200.
DOI: 10.1016/s0375-9601(99)00449-1
Google Scholar
[19]
I.R. Kenyon General Relativity, Oxford University Press. (1990).
Google Scholar