Dealing with Uncertainties in Manufacturing Process Simulations

Article Preview

Abstract:

Uncertainty in manufacturing processes is as old as the manufacturing process itself. Simulationson the other hand are always certain in their outcome based on the chosen parameters. Nonethelessit makes sense to incorporate uncertainties in the simulation for validation and analysis of the realand simulated processes. This paper aims on highlighting the importance of an accurate understandingand measurement of uncertainty for simulation validation and thus to increase the significance andacceptance of simulation results in the working environment.

You have full access to the following eBook

Info:

* - Corresponding Author

[1] R. R. Barton, B. L. Nelson, and W. Xie. Quantifying input uncertainty via simulation confidence intervals. INFORMS journal on computing, 26(1): 74-87, (2013).

DOI: 10.1287/ijoc.2013.0548

Google Scholar

[2] J. W. M. Bertrand and D. R. Muntslag. Production control in engineer-to-order firms. International Journal of Production Economics, 30: 3-22, (1993).

DOI: 10.1016/0925-5273(93)90077-x

Google Scholar

[3] D. E. Bray and R. K. Stanley. Nondestructive evaluation: a tool in design, manufacturing and service. CRC press, (1996).

Google Scholar

[4] N. R. Council. Assessing the reliability of complex models: mathematical and statistical foundations of verification, validation, and uncertainty quantification. National Academies Press, (2012).

DOI: 10.17226/13395

Google Scholar

[5] P. De Bièvre. The 2007 International Vocabulary of Metrology (VIM), JCGM 200: (2008).

Google Scholar

[6] R. Desai. On fine motion in mechanical assembly in presence of uncertainty. PhD thesis, Ph. D. thesis, Department of Mechanical Engineering, the Univ. of Michigan, (1989).

Google Scholar

[7] X. Du and W. Chen. Methodology for managing the effect of uncertainty in simulation-based design. AIAA journal, 38(8): 1471-1478, (2000).

DOI: 10.2514/3.14570

Google Scholar

[8] M. L. Fisher and C. D. Ittner. The impact of product variety on automobile assembly operations: Empirical evidence and simulation analysis. Management science, 45(6): 771-786, (1999).

DOI: 10.1287/mnsc.45.6.771

Google Scholar

[9] R. G. Hills. Model validation: model parameter and measurement uncertainty. Journal of Heat Transfer, 128(4): 339-351, (2006).

DOI: 10.1115/1.2164849

Google Scholar

[10] P. Jonsson and M. Lesshammar. Evaluation and improvement of manufacturing performance measurement systems-the role of OEE. International Journal of Operations & Production Management, 19(1): 55-78, (1999).

DOI: 10.1108/01443579910244223

Google Scholar

[11] M. D. McKay, J. D. Morrison, and S. C. Upton. Evaluating prediction uncertainty in simulation models. Computer Physics Communications, 117(1-2): 44-51, (1999).

DOI: 10.1016/s0010-4655(98)00155-6

Google Scholar

[12] T. S. Mujber, T. Szecsi, and M. S. Hashmi. Virtual reality applications in manufacturing process simulation. Journal of materials processing technology, 155: 1834-1838, (2004).

DOI: 10.1016/j.jmatprotec.2004.04.401

Google Scholar

[13] G. Ngaile and T. Altan. Simulations of manufacturing processes: Past, present, and future. Advanced technology of plasticity 2002-Proceedings of the 7th ICTP, 1: 271-282, (2002).

Google Scholar

[14] A. V. Oppenheim, A. S. Willsky, and S. H. Nawab. Signals and systems 2nd ed. New Jersey: Prentice Hall, (1997).

Google Scholar

[15] K. Potter, P. Rosen, and C. R. Johnson. From quantification to visualization: A taxonomy of uncertainty visualization approaches. In Uncertainty Quantification in Scientific Computing, pages 226-249. Springer, (2012).

DOI: 10.1007/978-3-642-32677-6_15

Google Scholar

[16] N. F. Roozenburg and J. Eekels. Product design: fundamentals and methods, volume 2. Wiley Chichester, (1995).

Google Scholar

[17] S. -F. Su and C. G. Lee. Manipulation and propagation of uncertainty and verification of applicability of actions in assembly tasks. IEEE Transactions on Systems, Man, and Cybernetics, 22(6): 1376-1389, (1992).

DOI: 10.1109/21.199463

Google Scholar

[18] W. H. Tang and A. Ang. Probability Concepts in Engineering: Emphasis on Applications to Civil & Environmental Engineering. Wiley, (2007).

Google Scholar

[19] Z. Tang, F. J. Liu, S. H. Guo, J. Chang, and J. J. Zhang. Evaluation of coupled finite element/meshfree method for a robust full-scale crashworthiness simulation of railway vehicles. Advances in Mechanical Engineering, 8(4): 1687814016642954, (2016).

DOI: 10.1177/1687814016642954

Google Scholar

[20] J. R. Taylor. An Introduction to Error Analysis: The Study of Uncertainties in Physical Measurements. University Science Books, Jan. 1997. Google-Books-ID: giFQcZub80oC.

Google Scholar

[21] J. Wang, C. Wang, T. Zhang, and B. Zhong. Comparison of Different Independent Component Analysis Algorithms for Output-Only Modal Analysis. Shock and Vibration, 2016, (2016).

DOI: 10.1155/2016/6309084

Google Scholar

[22] M. Wazed, S. Ahmed, Y. Nukman, and others. Uncertainty factors in real manufacturing environment. (2009).

Google Scholar

[23] R. V. Wilson. Estimating uncertainty in computations of two-dimensional separated flows. (1994).

Google Scholar

[24] Q. Yu, H. Zhou, and L. Wang. Finite element analysis of relationship between tightening torque and initial load of bolted connections. Advances in Mechanical Engineering, 7(5): 1687814015588477, (2015).

DOI: 10.1177/1687814015588477

Google Scholar

[25] T. Zou, M. Cai, R. Du, and J. Liu. Analyzing the uncertainty of simulation results in accident reconstruction with Response Surface Methodology. Forensic science international, 216(1): 49- 60, (2012).

DOI: 10.1016/j.forsciint.2011.08.016

Google Scholar

[26] F. Zouaoui and J. R. Wilson. Accounting for input model and parameter uncertainty in simulation. In Proceedings of the 33nd conference on Winter simulation, pages 290-299. IEEE Computer Society, (2001).

DOI: 10.1109/wsc.2001.977287

Google Scholar

[27] F. Zouaoui and J. R. Wilson. Accounting for parameter uncertainty in simulation input modeling. Iie Transactions, 35(9): 781-792, (2003).

DOI: 10.1080/07408170304413

Google Scholar