Discussion on Calculation to Equal Step Distance Different Cycle Time Flow Project Period with Intermission in Multiple Construction Storey

Abstract:

Article Preview

When there are storey-to-storey relationships or construction storey by storey, to discuss the flow construction cycle time with technology intermission or organizing intermission time. When the category of the construction sections can meet the requirements of formula, i.e. , has included middle storey intermission in construction period calculation formula, there is not single item; When the category of the construction sections can not meet the requirements of formula, i.e. or , there should make single item in middle storey intermission in construction period calculation, at that time, the working team can not be continuous and the working surface can make maximum connection.

Info:

Periodical:

Edited by:

Xuejun Zhou

Pages:

2333-2336

DOI:

10.4028/www.scientific.net/AMM.94-96.2333

Citation:

W. J. Wang "Discussion on Calculation to Equal Step Distance Different Cycle Time Flow Project Period with Intermission in Multiple Construction Storey", Applied Mechanics and Materials, Vols. 94-96, pp. 2333-2336, 2011

Online since:

September 2011

Authors:

Export:

Price:

$35.00

In order to see related information, you need to Login.

In order to see related information, you need to Login.