Discussion on Calculation to Equal Step Distance Different Cycle Time Flow Project Period with Intermission in Multiple Construction Storey

Article Preview

Abstract:

When there are storey-to-storey relationships or construction storey by storey, to discuss the flow construction cycle time with technology intermission or organizing intermission time. When the category of the construction sections can meet the requirements of formula, i.e. , has included middle storey intermission in construction period calculation formula, there is not single item; When the category of the construction sections can not meet the requirements of formula, i.e. or , there should make single item in middle storey intermission in construction period calculation, at that time, the working team can not be continuous and the working surface can make maximum connection.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2333-2336

Citation:

Online since:

September 2011

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Jianfeng Li. Construction [M ]. Beijing: China's Construction Industry Press, in chinese 2004.

Google Scholar

[2] Lijun Yu, Sun Baoqing. Construction Project Construction Organization [M].Beijing: High Education Press, in chinese 2005.

Google Scholar

[3] Chongqing University Tongji University Harbin Institute of Technology .Civil engineering construction [M].Beijing: China Construction Industry Press, in chinese 2009 .

Google Scholar