The Quality Control on Shengmi Bridge Arch Rib Construction

Article Preview

Abstract:

Introduced the essential construction craft of Nanchang Shengmi bridge (75+2×228+75m center bearing type steel tube concrete tie bar arched bridge). According to the construction craft and the quality specification request, discussed the steel arched bridge manufacture and the anticorrosion, the steel arched bridge rib erects, the steel arched bridge rib welding, the steel arched bridge in concrete configuration and the scene constructs, the steel tube protection coating construction, then proposed the construction quality control of large span steel tube concrete arch bridge. The conclusion of the article may be used at the similar steel tube concrete arched bridge construction.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 1004-1005)

Pages:

1464-1467

Citation:

Online since:

August 2014

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Shengwu Huang: Bridge construction and organization management (People's Traffic Press, China 1992). In Chinese.

Google Scholar

[2] Baochun Chen: Design and construction steel tube concrete arch bridge (People's Traffic Press, China 1999). In Chinese.

Google Scholar

[3] Lichu Fan: Bridge engineering (People's Traffic Press, China 2010). In Chinese.

Google Scholar