Estimation of Reduction Depreciation Charges in Power Network when DG Source is Connecting

Article Preview

Abstract:

This paper observes the impact of distributed generation (DG) on the durability and depreciation costs for operation of power transformers. A mathematical model for calculating of change in depreciation charges and results of experimental calculations are given. Various mechanisms for the use of the obtained criterion are proposed.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 1008-1009)

Pages:

819-822

Citation:

Online since:

August 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] S. Kotamarty, S. Khushalani, and N. Schulz, Impact of distributed generation on distribution contingency analysis, Elect. Power Svst. Res., vol. 78, no. 9, pp.1537-1545, Sep. (2008).

DOI: 10.1016/j.epsr.2008.01.020

Google Scholar

[2] V. Bazutkin: High-voltage engineering: Isolation and power surge in electrical systems, Energoatomizdat, Moscow, (1986).

Google Scholar

[3] V.G. Kuznetsov, Improving the quality of energy in electric grids, Naukova Dumka, Kiev, (1985).

Google Scholar