Advanced Materials Research
Vols. 1061-1062
Vols. 1061-1062
Advanced Materials Research
Vol. 1060
Vol. 1060
Advanced Materials Research
Vol. 1059
Vol. 1059
Advanced Materials Research
Vol. 1058
Vol. 1058
Advanced Materials Research
Vol. 1057
Vol. 1057
Advanced Materials Research
Vol. 1056
Vol. 1056
Advanced Materials Research
Vol. 1055
Vol. 1055
Advanced Materials Research
Vol. 1054
Vol. 1054
Advanced Materials Research
Vol. 1053
Vol. 1053
Advanced Materials Research
Vol. 1052
Vol. 1052
Advanced Materials Research
Vol. 1051
Vol. 1051
Advanced Materials Research
Vols. 1049-1050
Vols. 1049-1050
Advanced Materials Research
Vol. 1048
Vol. 1048
Advanced Materials Research Vol. 1055
Paper Title Page
Abstract: In the background of condition-based maintenance (CBM), the equipment maintenance levels in a certain state have different choices, which has different impacts on the improvement of the equipment state and maintenance costs, which in turn affects the time schedule of equipment maintenance. Therefore, in this paper the equipment maintenance time and maintenance level are viewed as decision variables to make maintenance schedules. This paper presents a risk-based optimization model for system maintenance scheduling problem, considering the state of equipment, correlations of the equipment and the operation of grid. An optimization model minimizing total risk of grid operation by balancing system maintenance risk and failure risk is established, so that both optimal maintenance level and optimal maintenance time could be determined simultaneously. An example is taken to verify the validity of the model.
383
Abstract: This paper puts forward a creative turbine micro-siting scheme breaking the 3D-5D rule, and calculates wake losses, power production and its economic benefits in traditional wind farm micro-siting scheme and creative wind farm micro-siting scheme by evaluating software WEPAS and MWVE. Results show that the micro-siting scheme breaking 3D-5D is more feasible and effective. It not only ensures the safe and stable operation of the wind turbines and technical parameters, but also the power production and the initial investment have been optimized.
389