Analysis of Operation of AVC System in Fuzhou Power Grid
Abstract:
Through the statistics of AVC system equipment availability, closed loop rate, action number and success rate, analyses the operation of AVC system in Fuzhou power grid, there are still many problems, such as closed loop rate is not high, some AVC substation remote low success rate.In order to effectively improve the pertinent measures from the design, operation and maintenance, fixed value management etc..