Abstract:

For the purpose of foundation and structure stability during the construction of tide embankment, three monitoring projects including embankment settlement monitoring, berm platform settlement monitoring and pore water pressure monitoring are installed. Integrated monitoring data shows that foundation appears oversize instantaneous settlement on account of high construction speed, short loading interval at initial stage. Following with the shaping of embankment, stable monitoring data range, slow change rate and high dissipation speed of pore water pressure come along. Based on actual embankment settlement data, consolidation degree of soil mass is high and foundation stability becomes strong by means of hyperbolic curve.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 1065-1069)

Pages:

499-502

Citation:

Online since:

December 2014

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2015 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Z. Z. Yin: Geotechnical Principles. Water Power Press, China, Beijing, 2007, in press.

Google Scholar

[2] H. B. Wang, H. X. Yang, H. Zhang: Architecture Technology, Vol. 41, 257-260(2010). (In Chinese).

Google Scholar

[3] G. F. An, J. Y. Gao: Chinese Journal of Geotechnical Engineering, Vol. 29, 872-879 (2007). (In Chinese).

Google Scholar

[4] Q. W. Li, L. H. Chen, J. M. Cheng: Construction Technology, Vol. 37, 30-32 (2008). (In Chinese).

Google Scholar

[5] A. B. Zhong, Z. X. Liu: Highway, Vol. 8, 216-219 (2004). (In Chinese).

Google Scholar

[6] Z. P. Li, Y. T. Zhang: Site Investigation Science and Technology, Vol. 2, 22-24 (2012). (In Chinese).

Google Scholar