Analysis of the Formation Path of the Residual Value Risk in Public Private Partnership Projects Based on SEM Method

Article Preview

Abstract:

Over the last 15 years, public-private partnership (PPP) has been acknowledged by many countries as an innovative approach to the procurement of public projects. In the long term of concession periods, Residual Value Risk (RVR) is a structured risk system which would happen at any time in the whole life before transfer of PPP/PFI projects, but consequently causes the Residual Value (RV) that the Government takes over cannot fulfill the specifications. So the RVR factor system was identified through the literature review and a worldwide structured questionnaire survey was conducted to analyze the significance of the identified risk factors of RVR. Furthermore, the formation path of RVR was verified based on Structural Equation Modeling (SEM). Through the proposed formation path of RVR, both the public sector and private sector can monitor the risks to help improve the implementation of PPP projects and achieve PPP project success.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 1079-1080)

Pages:

1126-1130

Citation:

Online since:

December 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2015 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] X. Jin: J. Construct. Eng. Manage. Vol 136 (2009), pp.138-150.

Google Scholar

[2] Y.J. Ke, S.Q. Wang, A. Chan: J. Infrastruct. Syst. Vol 16 (2010), pp.343-351.

Google Scholar

[3] E. Cheung, A. Chan: Journal of Urban Planning and Development Vol 137 (2011), pp.409-415.

Google Scholar

[4] A. Chan, J. Yeung, C. Yu: J. Manage. Eng. Vol 27 (2011), pp.136-148.

Google Scholar

[5] J. Li, P.X. Zou: J. Construct. Eng. Manage. Vol 137 (2011), pp.1205-1209.

Google Scholar

[6] G. Heravi, Z. Hajihosseini: J. Infrastruct. Syst. Vol 18 (2012), pp.210-217.

Google Scholar

[7] K.S. Rebeiz: J. Manage. Eng. Vol 28 (2012), pp.421-428.

Google Scholar

[8] J.F. Yuan, C. Wang, M.L. Skibniewski: J. Manage. Eng. Vol 28 (2012), pp.252-264.

Google Scholar

[9] J. Chou, H.T. Ping, C. Lin: Transport Policy Vol 22 (2012), pp.36-48.

Google Scholar

[10] B. Hwang: International journal of project management Vol 31 (2013), pp.424-433.

Google Scholar

[11] Information on http: /www. partnerships. vic. gov. au.

Google Scholar