Effect of Hydraulic Retention Time on Pretreatment of Sulfate-Laden Wastewater for Desulfurization-Denitrification Process

Abstract:

Article Preview

In order to treat wastewater rich in sulfate and organic carbon, an anaerobic attached-growth bioreactor was set up. It was the pretreatment of desulfurization-denitrification process. At hydraulic retention time of 128h-6.2h, sulfate removal rate and sulfide generating rate took on initial increasing and subsequent decreasing. At hydraulic retention time of 7.7h-10.2h, the removals of sulfate and organic carbon, sulfide generating rate reached 95.79%, 80% and 58.82%, respectively. The results showed that the suitable hydraulic retention time in sulfate reduction stage for the pretreatment of desulfurization-denitrification process was 7.7h-10.2h.

Info:

Periodical:

Advanced Materials Research (Volumes 113-116)

Edited by:

Zhenyu Du and X.B Sun

Pages:

536-539

DOI:

10.4028/www.scientific.net/AMR.113-116.536

Citation:

W. Li et al., "Effect of Hydraulic Retention Time on Pretreatment of Sulfate-Laden Wastewater for Desulfurization-Denitrification Process", Advanced Materials Research, Vols. 113-116, pp. 536-539, 2010

Online since:

June 2010

Export:

Price:

$35.00

In order to see related information, you need to Login.

In order to see related information, you need to Login.