[1]
H.B. Wang, A.J. Xu and L. Yao: Appling improved genetic algorithm for solving the production scheduling problem of steel-making and continuous-casting. Journal of University of Science and Technology Beijing. (accepted, to appear. In Chinese).
Google Scholar
[2]
A. Arezoo, B. Mehdi and T. Hamed: A novel hybrid algorithm for scheduling steel-making continuous casting production. Computers and Operations Research, Vol. 36(2009) No. 8, pp.2450-2461.
DOI: 10.1016/j.cor.2008.10.010
Google Scholar
[3]
X.F. Pang, S.P. Yu and W. Liu: Research and development of steel-making and continuous-casting dynamic intelligence scheduling system. Control Engineering of China, Vol. 12(2005) No. 6, pp.553-556. (In Chinese).
Google Scholar
[4]
B.L. Zhu, H.B. Yu: Production scheduling model and algorithm for steelmaking-continuous casting-hot rolling processes. Computer Integrated Manufacturing Systems, Vol. 9(2003) No. 1, pp.33-36. (In Chinese).
DOI: 10.1016/s1474-6670(17)37612-7
Google Scholar
[5]
L.X. Tang, J.Y. Liu and A.Y. Rong: A review of planning and scheduling system and method for integrated steel production. European Journal of Operational Research, Vol. 133(2001) No. 1, pp.1-20.
DOI: 10.1016/s0377-2217(00)00240-x
Google Scholar
[6]
L.X. Tang, P.B. Luh and J.Y. Liu: Steel-making process scheduling using Lagrangian relaxation. International Journal of Production Research, Vol. 40(2002) No. 1, pp.55-70.
DOI: 10.1080/00207540110073000
Google Scholar
[7]
X.F. Li, L.Y. Xu and H.H. Shao: The dynamic model of steel-making and continuous casting and a heuristic algorithm of dynamic scheduling. Journal of Shanghai Jiaotong University, Vol. 35(2001) No. 11, pp.1658-1662. (In Chinese).
Google Scholar
[8]
L. Sun: The model and solution method for steel-making and continuous-casting production scheduling under the hybrid production environment (MS, University of Science and Technology Beijing, China 2004), pp.10-25. (In Chinese).
Google Scholar