The Research and Application on Calculation Model of the Stagger-Jointed Assemble Lining Structure

Article Preview

Abstract:

A new calculation model of stagger-joint assemble is presented. The model can reflect three ways to transfer shear force between adjacent rings. To simplify the calculation model, a friction shear contact element is coded on ABAQUS secondary development platform and the nut of bolt is embedded in the segment. Using the model to analysis the Tunnel Through Yellow River, the results show that the integral rigidity of the lining structure improve obviously and the local modify effective have an impact on the adjacent area near ring-joint surface more than away from area.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 163-167)

Pages:

1823-1828

Citation:

Online since:

December 2010

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] ZHU He-hua, Hashimoto.T. Geotechnical Aspect of Underground Construction in Soft Ground. 15-17.

Google Scholar

[2] ZHU Wei, HUANG Zheng-rong, LIANG Jing-hua. Chinese Journal of Geotechnical Engineering, 2008, 28(8), 940-947.

Google Scholar

[3] Blom C.B. M, Van.E. J, Jovanovic P.S. Tunneling and Underground Space Technology, 1999, 14(2), 217-224.

Google Scholar

[4] Lee, K. M., Kerry Rowe, R. and Lo, K. Y. Canadian Geotechnical Journal., 1992, 29, 929-954.

Google Scholar