Study on Cost Management under EPC General Contracting Model

Article Preview

Abstract:

As a new mode of implementation for the construction project, EPC mode is more and more highly praised by owner and contractor. The owner can reduce the risk through implementing this mode and make the price of project relatively regular at the same time. However, because the owner seldom participates in this mode, in addition, the same contractor charges design and construction of the project, the owner’s controls to the price of project becomes more and more difficult. This paper discusses reasonable determination and effective control method and means to the price of the project under EPC mode according to the characteristic.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 181-182)

Pages:

49-53

Citation:

Online since:

January 2011

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Zhang Shuibo, Zhang Le, Gao Yuan, Risk Allocations in Construction Contract, Surveyors Times, 2006, 15(15).P. 135~141.

Google Scholar

[2] Zhang Shuibo, Chen Yongqiang , Contract Management for International EPC/Turnkey Projects, 2009. 1.P. 110~118.

Google Scholar

[3] Yang Li, Liu Hui, Project Cost Control in Design Stage for EPC Contract Mode, Petroleum Refinery Engineering Vol. 7 (2008). P. 54~56.

Google Scholar

[4] Wang Hui, How to Control the Total Project Cost for the Implementation of the EPC, Architectural Design Management, Vol. 6 (2008).P. 56~57.

Google Scholar

[5] Zheng Bing, Cost Management for EPC General Contracting, Popular Science, Vol. 2 (2008). P. 88~90.

Google Scholar

[6] Jiang Huihua, Tang Tao, Talking about the Cost Management and Control under EPC General Contracting Model, SCI—TECH Information Development &Economy, Vol. 19 (2009). P. 224~225.

Google Scholar