A Production Planning Model for Make-To-Order Companies with Capacity Constraint

Article Preview

Abstract:

This paper proposes a decision-making model of the planning quantity put into production for Make-To-Order (MTO) companies with capacity constraint. The low repeatability and the uncertain products eligibility-rate of the MTO production systems are fully taken into account, and an optimal solution is presented. Finally, a numerical example is given to illustrate the validity of the model.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 201-203)

Pages:

1066-1069

Citation:

Online since:

February 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] L.C. Hendry and B.G. Kingsman: Eur. J. Oper. Res, Vol. 44 (1989), p.1.

Google Scholar

[2] M.A. Carravilla and J.P. Sousa: Eur. J. Oper. Res, Vol. 86 (1995), p.43.

Google Scholar

[3] C.H. Yeh: Ind. Manage. Data. Syst, Vol. 100 (2000), p.180.

Google Scholar

[4] H. Jodlbauer: Int. J. Prod. Econ, Vol. 111 (2008), p.793.

Google Scholar

[5] B.X. Zhang, J. Song and L.Y. Guan: Syst. Eng. Theor & Pract, In Chinese, (2008), p.165.

Google Scholar