Study on Incentive Mechanism of Large-Scale Dredging Project Based on Fairness Preference

Article Preview

Abstract:

This paper establishes fair incentive model of large-scale dredging project using principal-agent theory and fairness preference theory and analyzes the influence of technical parameters of ships and bid price of the dredging project on principal, agent incentives and profits. Study shows that the principal-agent model must be corrected, so this paper puts forward correction methods and calculation methods.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 219-220)

Pages:

144-150

Citation:

Online since:

March 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Forsythe R, Horowitz JL, Savin NE. Fairness in simple bargaining games[J]. Games and Economic Behavior, 1994, (6):347~369.

DOI: 10.1006/game.1994.1021

Google Scholar

[2] Agell J, Lundborg P. Theories of pay and unemployment: survey evidence from Swedish manufacturing firms[J]. Scandinavian Journal of Economics, 1995, 97(2): 295~307.

DOI: 10.2307/3440530

Google Scholar

[3] Fahr R, Bernd I. Fairness as a constraint on trust in reciprocity: earned property rights in a reciprocal exchange experiment[J]. Economics Letters,66(3):275~282.

DOI: 10.1016/s0165-1765(99)00236-0

Google Scholar

[4] Akerlof GA, Yellen JL. Fairness and unemployment[J]. American Economic Review, 1988, 78(2):44~49.

Google Scholar

[5] Blinder AS,Choi DH.A shred of evidence on theories of wage stickiness[J]. Quarterly Journal of Economic,1990,105(4):1003~1015.

DOI: 10.2307/2937882

Google Scholar

[6] Bewley TF. A depressed labour market as explained by payticipants[J]. American Economic Review, 1995, 85(2):250~254.

Google Scholar

[7] Campbell CM,Kamlani KS. The reasons for wage rigidity: evidence from a survey of firm[J]. Quarterly Jourly of Economics, 1997, 112(3):759~789.

DOI: 10.1162/003355397555343

Google Scholar

[8] Bin Zhou,Zi Gang Zhang ,Pricing the Cost of Dredging Engineering Based on the Dynamic Game, Vol.2 No.184, Ó 2010 IEEE.

Google Scholar