Study of the Mechanics Behavior of Small Net Distance Half-Open and Half-Hidden Structure Tunnel

Article Preview

Abstract:

Basing on the tunneling of Jiaowu tunnel, combining with finite element program, the continuous excavation by load steps is simulated through the “activation and passivity” method. The mechanics behavior of the half-open and half-hidden structure tunnel and the characteristic of stress and deformation of surrounding rock supporting system are studied and gained. By comparing the analysis results with in-situ testing data, Analysis shows that the calculation is correct and that tunneling surrounding rock deformation is of predictability.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 243-249)

Pages:

3343-3348

Citation:

Online since:

May 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Zhenqi Xu, Haibo Li.. Anhui Construction.2007(1):26-27(In Chinese)

Google Scholar

[2] Jinyi Han. Borqining. Shijiazhuang Railway Institute.2007(3):118-121(In Chinese)

Google Scholar

[3] Feng Qin Cunxin Wu. Modern Tunnel technolog, 2003, 12(40):39-42,49(In Chinese)

Google Scholar

[4] Chenghua Si, Limei Pen..2007, 26(1):2809-2814(In Chinese).

Google Scholar

[5] Huantong Wu.2002, 10:18-20,29(In Chinese).

Google Scholar

[6] Jianming Hu, Yongxin Zhang. Chongqing Architecture University, 2006, 28 (6):68-71(In Chinese)

Google Scholar