The Thermal-Wet Environment Testing and Analysis of Underground Plant Traffic Tunnel

Article Preview

Abstract:

This article takes underground powerhouse as engineering objects, adopting manual and automatic monitoring way to measure the inlet air temperature and the relative humidity of the 7 cross-sections underground traffic tunnel, and the temperature inside the cave wall in 3 working conditions. Furthermore, this article analyzes the results and expounds the causes for fog and condensation inside the tunnel. Finally, it proposes some effective measures to solve the problems, which can be applied to the similar air conditioning system design of the underground buildings.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 243-249)

Pages:

4988-4993

Citation:

Online since:

May 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] HVAC design manual for underground construction,Beijing. China Building Industry Press,(1983)

Google Scholar

[2] Y.M. Xiao,Studies on Natural Ventilation Network Simulation and Application of the underground Excavation Cluster of Hydropower Station,Chongqing University,(2005)

Google Scholar

[3] F.Pei,Field test , Theory analyse and Simulation on heat humidity of underground transformer conveyance tunnel in Hydropower Station,West China University,(2009)

Google Scholar

[4] G.D. Wang,etc.,Building Energy & Environment ,Vol.28 No.2(2009),P27

Google Scholar

[5] Z.H.Fu,Underground Space,Vol.17. No.1(1997),P.39

Google Scholar

[6] R.Y. Zhao,etc.,Air-conditioned, Building Industry Press,( 2006)

Google Scholar