An Analysis of Seepage Prevention Wall Behaviours of Deep Overburden Dam with Clay Core

Article Preview

Abstract:

The Duncan-Chang nonlinear constitutive model is used to carry out a three- dimensional finite element analysis of Xia Ban Di deep overburden dam with clay core (147.95m). The regularity of the change of stress and displacement with the change of material parameters under nine kinds of materials mix proportion is obtained and the optimum analysis result of stress and displacement for the seepage prevention wall is given in this paper.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 250-253)

Pages:

4022-4025

Citation:

Online since:

May 2011

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Yuzheng Yu, Jialin Pu, et al. Study on Mechanical Properties of Plastic Concrete for cut-off Wall[J]. Journal of Hydraulic Engineering, 1995(8):21-27 In Chinese

Google Scholar

[2] Xingwang Dou, Yixing Lin, et al. Shaking Table and Dynamic Numerical Analysis of High Rock fill Dams Constructed on Deep Overburden[J]. Advances in Science and Technology of Water Resources, 2000, Vol 20(6):19-22 In Chinese

Google Scholar

[3] Chunlou Ji, Songyou Xia, et al. Dynamic Analysis of Asphalt Concrete Core Rock fill Dams Constructed on Deep Overburden[J]. Journal of He Hai University,1995,Vol 23(5):74-80 In Chinese

Google Scholar

[4] Peng Li, et al. Report on the Static Characteristics of the Sand Soil in Dam Foundation[M]. Experiment Center of Northwest Hydraulic Research Institute,2002,1 In Chinese

Google Scholar