p.1034
p.1039
p.1043
p.1048
p.1052
p.1056
p.1061
p.1065
p.1070
Overall and Step Iterative Algorithm of Cable Force for Multi-Rib Steel Truss Arch Bridge in Procedure of Rib Segments Assembling
Abstract:
Taking deformation of the main arch under dead load as the arch alignment control target, the overall cable force and pre-camber of multi-rib arch were calculated by zero-order optimization method. According to the installation sequences of arch segments, taking deviation of cable tower, cables in one-time tensioning method and the section stress of arch chords as constraint conditions, the cable force and pre-camber for every segment were calculated by iterative method. This method is applied to the erection of a 400m steel truss arch bridge with three ribs, the calculated values of cable force are anastomosed with the measured ones, and the precision of arch alignment is high.
Info:
Periodical:
Pages:
1052-1055
Citation:
Online since:
May 2011
Authors:
Price:
Сopyright:
© 2011 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: